FISCAL_YEAR 2008 <br />FUND 3S1 <br />Principal Minor Urban Local Construction <br /> FY08 Arterial Arterial Collector Streets Project Capacity System System ConsiructionlEzpansion RepairlPreservation <br />Project# ProjeciDescription GRNT Posted 2.41m 2.10m 3.3Sm 0.4Sm ROW Engineering New Improvement Preservation Enhancement Road Bridge Road Bridge <br />915014 River Avenue 1,073,892.34 1,073,892.34 1,073,892.34 <br />985422 ASSM:6THAlIeyTylertoPolk 39,838.69 38,846 993.12 39,838.69 <br />Grand Total 1,113,731.03 0.00 0.00 0.00 0.00 0.00 38,84S.S7 0.00 0.00 0.00 1,074,885.46 39,838.69 0.00 1,073,892.34 0.00 <br />945674 Debrick Rd & Butte Ln Impr ($585) <br />955064 WUN Alley Improvements ($5,259) <br />965165 Legacy Interceptor South $126,782 Wastewater- not a street improvement <br />Subtotal ofnon-qualifying projects 120,937.46 <br />1,240,512.74 <br />