New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4317 CO#1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4317 CO#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 2:51:50 PM
Creation date
10/1/2008 2:20:11 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004317
Identification_Number
CO#1
COE_Contract_Number
2008-00017
Retention_Destruction_Date
9/10/2018
Sticky Note
ID:
1
Text:
Request purchasing to increase PO by CO#1 10.09.08 to make final payment on contract. PWAddc 10.9.08
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> CITY OF EUGENE <br /> DEPARTMENT OF PUBhIC WORKS <br /> • ENGINEERING DNISION <br /> Chatlget)rder Job# 4317 <br /> Caniract# 200&1T <br /> CDNTRACTOR:~ne Sand and Gravel Change thdar# 1 <br /> Dale: ! 9 <br /> (AOORE95i PO Box 1067 /TG/O - e <br /> E~!rene OR 87440 _ CAMS Oate• - <br /> Reviewed b . Data: <br /> PROJECT: 2009 PevemaM preservaUCn proOrem MIA Sbeet AUay RCC ~ Spector M. i(otvula <br /> ' Tram 12thAVenuetol3ih~Avemre _ _ . <br /> . Prof. Mgt. M. Roddnves_,~Z/! <br /> Pdndpal Eng. K Klooe ~1[ <br /> You are dlrtuted to make the t'ogowing changes In this contract: <br /> ~ Contract <br /> ' Ram <br /> Na <br /> <br /> 1 51 Pedorm OverexcavaUon fn areas as directed the CI <br /> <br /> J <br /> , 81 Pedomt dndM of site surface to iadAtete dram a in areas es directed b the CIL share costs 50°k with a <br /> oral cost 45.00 ent to eontracter 172.60. <br /> " 92 Pedaml atctdn of eurfacelo reveMwealhedn aharecosts50%wilhthe toteicast51146.71 enttoconttactor5572b <br /> 111 Chan a forma to inaease alts of Iain PCC sumsundin exisU catch basin #57023. <br /> This changes the Wd Rams as folbws: <br /> Contract Contract <br /> item Time Quantity UnR Amended Net <br /> No. Item Change (Units Cost Amount Change Change <br /> 51 CNereXCairatlan Crtl inal 0.00' AO .00 SOAO <br /> . ~ 0 ReNSed OAO OAO .00 <br /> ' ~ Amended 1.00 IS 5828.56 82&56 392956 <br /> 91 PerrurmOMdln90falkytofadAtate Orl Inai a00 AO .00 ~ ~ SO•~ <br /> drainage 0 Revised 0.00 .00 OAO <br /> ' ~ Amended LW is 3172.SD 5372.50 <br /> • sz perform pattldrg of easy, od t a0o .90 .oo #0.09 <br /> 9 ttevtsed aa9 AO a.99 . <br /> Amended SAO !S 5/2.&6 6 5572.86 <br /> 111 Changes to plain PCC catch basin wmowxt Inal 0.00 AD .00 50.00 <br /> 0 Revised 0.00 AO 0.00 - <br /> ' Amended 1A0 l5 226.41 226.41 226.41 <br /> Orl hurl OAO .Oil 0.00 50.00 . <br /> Revised 0.00 0.00 .00 • <br /> / Amended OAO OAO 0.00 0.00 <br /> Inal 0.00 .00 0.00 SO•~ <br /> Revised OAD 0.00 0.00 <br /> Amended OAO .00 #9A0 3D.09 <br /> - "The original contract work days <br /> ere 9.o da a ~ , <br /> The contract time dtange this C.O o.e da s <br /> The contract time change by previous C.O.°s o.o day <br /> The new contract work da are 0.0 d <br /> ' The original contractsumwas -,,,,,,__,____,,,~,__r.,_,_„ a3s.oz5.so <br /> Net change by prevtous change order 50.00 <br /> Net change due to amendment by previous dtenge order _w~~•- So.oo <br /> The contract sum prior to this change order was s38.o2s.so <br /> This change onierw111 change contract sum bythls amount S1.eoo.33 <br /> The new contract net charOe sum ~•~o <br /> The new contract amendment sum St,800.33 <br /> The new contract twm inducting fhls change onierwlll be 539.825.83 <br /> i Percents a of od hlal contract 4.73% <br /> NET CHANGE UE TO AMENDMENTS <br /> Approve <br /> Cily eer Prime tra o/r~ Third Party ~ • <br /> 7i l~ n <br /> Date Da Date <br /> CONTRACTOR ~ ,OFFICE FILE ~ PURCHASING/CR0 <br /> • 01FOR1ASIPROJrdi1CONSMEViSEDCtWNGEORDERXLS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.