New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4437 Warranty Final
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4437 Warranty Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 10:22:43 AM
Creation date
10/1/2008 2:18:44 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004437
COE_Contract_Number
2008-00005
Retention_Destruction_Date
12/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Acceptance Punaworks , <br /> <br /> Completion of Warranty Period E"g."eer'ng <br /> 244 East Broadway <br /> Eugene; OR 97401 <br /> (541.) 682-5560 <br /> (541) 682-8410 <br /> To: Blackline; Inc.. Date: September 26, 2008 - <br /> From:. Charles Heath <br /> Project: 2007-Slurry Seal <br /> Contract Number. 2008-05 Job Number: 4437 <br /> A warranty .inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specfications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> . Owner. <br /> Address: <br /> <br /> Q:\PROJECTS\PROJ-7\4437\Correspondence\Contractors\4437 92608 Final Acceptance Completion of Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety ° PW Admin Construction Manager Revised 4104 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.