Public Works <br />Englneering <br />Final Acceptance <br />;Completion of Warrainty Period <br />To; Eugene Sand & Gravel Date:; September 25, 2008 <br />PO Box 1067 <br />Eugene OR 97440 From: Glen A. Fee <br />Project: 2007 PPP Oakpatch Rd, Monroe St, and Chambers St. <br />Contract Nutuber: 2007-20 <br />Job Number: 4208,4344,4347. <br />244 East Broadway <br />Eugene, OR 97401 <br />(541) 682-5560 <br />(541) 682-8410 <br />A warranty inspection has been made on,this project in accordance with Section 00150 of the <br />City Standard Specfications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED. PROJECTS ONLY- <br />Engineer <br />Address: <br />Owner. <br />Address: <br />ENG 1122. Contractor File Engineer Owner Surety PW Admin Construction Manager ~~ Revised 4/04 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects Ma /~y~ <br />