CITY OF~EUGENE <br />>., . <br />_ PROPOSAL. <br />~. <br />' , AUGUST 12, 2008, 2:00 :P.M. ~ JOB #4544 :BID NUMBER 24 . <br />TO`THE CITY MANAGER : ~ BIDDER: ~ ~~~~~ - <br />. ,EUGENE, OREGON ~ , <br />.The.undersignedBrdder declares: <br />-That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included <br />t- in the Book of Contract Documents and' Specifications for this job which includes but is not limited to the Plans, City ,` <br />~ ' <br />.Standard Specifications and Standard Drawings, Supplemental Specifications~and Special Provisions, and City of Eugene. <br />. .. . ~ Amendment #3, #4 and #5, Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br />' ~ ~ ~- ~ TONAWANDA PUMP STATION : , <br />CAPACITY UPGRADES.. - <br />' j CAPITAL'IMPROVEMENT PROJECT <br />. ' <br />` : Tliat Bidder has made an exanunation of the site of the proposed work and~has made such investigations as are <br />necessary to determine the character of the material and the conditions to be encountered, independently of the indication - <br />- . <br />on the plans; and that if the Proposal is accepted, Bidder will contract with the City of Eugene as provided in the Contract. <br />~~ `_ :Form, will to the extent of this bid, provide the necessary machinery, tools, apparatus, and other means'of construction, ,~ <br />and will furnish all material and labor as specified, or called for by the Plans or necessary to complete the work in the <br />mannerapecified and in accordance with the requireiiients of the Engineer: <br />`. 1 ~ ~ , . <br />The undersigned also agrees that Bidder will. order all material and equipment included under this contract and <br />. - . <br />' ,will commence work within five ES) days after receipt ofNotice to Proceed and that Bidder will.complete the work in all <br />. respects after commencement and will have the prof ect completed BY NOVEMBER 1: 2008 and that Bidder will pay as , - <br />~- liquidated damages to the City for any delay, the sum of TWO HUNDRED DOLLARS ($200.00) ~ per day.for each day <br />. ' required beyond.that period. <br />`. PROPOSAL -JOB #4544 `. PAGE 1 of 3 <br />