New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4117 2009-00009
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4117 2009-00009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 11:04:11 AM
Creation date
9/17/2008 4:53:12 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004117
GL_Project_Number
935055
COE_Contract_Number
2009-00009
Retention_Destruction_Date
4/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
:!, ~° ,i, <br />also contain an endorsement naming City as an additional insured, in a form satisfactory to City, <br />and expressly providing that the interest of City shall not be affected'by Contractor's breach of <br />policy provisions. <br />9.3. Workers' Compensation Insurance. All employers, including. the. Contractor and its <br />Subcontractors, if any, that employ subject workers who are performing Work or providing labor <br />or Materials under the Contract in the state of Oregon shall comply with ORS 656.017 and <br />provide the required Workers' Compensation coverage, unless such employers are exempt <br />under ORS 656.126. The Contractor shall ensure that each of its Subcontractors .complies with <br />these requirements. Contractor shall provide City~with such further,assurances as City may <br />require from time to time that Contractor is in compliance with these Workers' Compensation <br />coverage requirements and the Workers' Compensation law. The Contractor shall ensure that its <br />insurance carrier files a guaranty contract with the Oregon Workers' Compensation Division <br />before performing any Work. <br />10. Performance and Payment Bonds. Prior to the commencement of the Work, Contractor shall <br />provide good and sufficient performance and payment borids.approved by City, each in an-amount <br />- equal to the 100% of the Contract Sum, for the faithful performance of the Work in all respects and <br />• ~ indemriifying Cityfior any claims or liens for labor, work, equipment or material' provided by others in <br />the performance of the Work.„The amount of the performance and payment bonds shall'be increased <br />whenever the Contract Sum is increased for any reason. <br />11. Termination and Suspension: City may terminate this contract or~suspend the Work at any time as <br />.provided in the Specifications. <br />12. Preference for Goods and Services. <br />12.1. Contractor shall use recyclable products to the maximum extent economically feasible in the <br />performance of the contract work set forth in this Document. ,Recycled products .include all <br />materials, goods and supplies, not less than 50 percent of the total,weight of which consists of <br />secondary and post consumer waste with not less than 10 percerit:of its total weight consisting <br />of post consumer waste, as weii as any product that could have been disposed of as a, solid <br />waste, having completed its life cycle as a consumer item, but otherwise refurbished for reuse <br />without substantial alteration of the product's form. <br />12.2. In performance of the Work, Contractor shall prefer materials that have been manufactured or <br />produced in the state of Oregon, if price, fitness, availabil'ay and quality are otherwise equal. <br />13. Default and Willful Violation: Without limiting the City's right to debar the Contractor for up to three <br />years, if the Contractor willfully violates any of the provisions of Sections 4:615 to 4.650 of the Eugene <br />Code, 1971, or any of the provisions of State law governing. public contracts, or if Contractor knowingly <br />files false affidavits of compliance required under the Contract, Contractor shall waive for a period of <br />one year any right to bid upon -any public improvement project let by City. If Contractor or any of <br />Contractor's Subcontractors violates any such provisions or files any such false affidavits of <br />compliance, or in the event Contractor otherwise fails to perform any of its obligations under this <br />contract, time and quality of performance being of the essence, City.may; at its option, terminate this <br />contract upon written notice to Contractor. In the event of a termination of this contract or a <br />subcontract under these provisions,_Contractor or the Subcontractor; if applicable, shall forfeit all <br />rights under this contract or the subcontract, as the case may be. The.Citjr's claim for damages under <br />paragraph 15 and any other relief available to City resulting from the Contractor's breach shall survive <br />a termination of the Contract. <br />14. Liquidated Damages. In the event the Work is not completed within the contract time as specified in <br />the Contract Documents, Contractor will pay to City liquidated damages as specified in the <br />Specifications. The parties believe that due to the costs of bringing an action and the difficulty of <br />establishing the exact amount of damages City will incur, it would be incohvenient and infeasible for <br />Public Improvement Contract for Use with Oregon Standard Specifications -Page 3 <br />(Revised February 2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.