New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4117 2009-00009
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4117 2009-00009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 11:04:11 AM
Creation date
9/17/2008 4:53:12 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004117
GL_Project_Number
935055
COE_Contract_Number
2009-00009
Retention_Destruction_Date
4/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,. 'U9/13J2On9 <br />-y , <br />~'.:" ` ,, <br />a <br />1459 FAX 541 992 941(? CIT'•r EUGEP~E P'k ENG <br />Public Works <br />Engineering <br />~ ~02i4n9 <br />City of Eugene <br />2a4 East Broadway <br />E~gerte, Oregon 97401 <br />(541)682-5560 <br />(54i) 682-8410 Fax <br />ADDENDUM NO. 1 <br />TO THE CONTRACT DOCUMENTS ANA SPECIFICATIONS FOR <br />2008 WASTEWATER MANHOLE REHAB.ILITATXON PROJECT <br />August 13, 2008 JOB #4117 BID NUMBER Z2 <br />TO ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent specifically <br />shown and noted. All other conditions shall remain the s:une. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum and the <br />total of these bid items then add in the appropriate place on the bid form. <br />CHANCES TO CALL FOR BIDS AND PROPOSALS• <br />BID CLOSING DATE: <br />FROM: Thursdsy, August 14, 2008 - 2:00 PM <br />TO: Thursday, August 21, 2008 - 2:00 PM <br />CHANGES TO BID SCHEDULE: <br />(DELETE) Original Bid Schedule dated 07/23/2008 <br />(ADD) Revised Bid Schedule dated OS/13/2008 <br />CHANGES TO SPECIAL PROVISIONS: <br />00492,41 CLEANING <br />(DELETE) From Paragraph 3 <br />"'Where sealing the entire manhole interior surface is indicated, the entire manhole surface from <br />cover to channel shall be thoroughly cleaned prior to sealing. Specific azeas of work as indicated <br />on the plan sheets and on the Manhole Schedule do not require cleaning of the entire interior <br />surface, only the affected areas," <br />(.4.DD) "The entire manhole surface from the lowest point of work to the cover shall be thoroughly <br />cleaned prior to sealing." <br />00492,80 MEASUREMENT <br />(REPLACE) Paragraph 2 with <br />"The quantities of Seal Joint nt Cone will be measured per each." <br />Q:~PROJECTS~PROJ-74411 TiCon~racllContractsi4117 Addendum#1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.