PUBLICiMPROVEMENT CONTRACT FOR USE WITH <br />OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br />AND: <br />CONTRACT NO <br />JOB NO.: <br />The City of Eugene, ~an Oregon <br />Municipal Corporation <br />Eugene Sand Construction Inc. <br />2009-00008 <br />4479 <br />(City) <br />(Contractor) <br />PROJECT: 2008 PAVEMENT PRESERVATION PROGRAM -ROOSEVELT BOULEVARD <br />FROM BELTLINE HIGHWAY TO CHAMBERS CONNECTOR (FEDERAL.AID <br />PROJECT #X-STP-2385 (058)) <br />RECITALS <br />Contractor was the successful bidder for the contract construction of the public improvement <br />project described in the plans and- specifications for the project that were included in the bid documents <br />and the Oregon Standard Specifications for Construction which form a part of this °con_tract. <br />AGREEMENT <br />The Contract. The Contract between the City and Contractor (the "Contract") includes this <br />Document and its exhibits, together with all of the documents and materials included in the definition <br />of the "Contract" under the 2002 Oregon Standard Specifications far Construction issued by the <br />Oregon Department of Transportation, as modified by the City's Amendments to the Specifications, <br />Supplemental Specifications for the Project and any other Special Provisions included in the Bid <br />Documents (all specifications and Special Provisions included in the Contract are collectively referred <br />to herein as the "Specifications"). In addition, the Contract between the City and Contractor shall be <br />deemed to incorporate all reports, records, laws, rules and orders referenced in the'Contract <br />documents. <br />This Document includes and incorporates the following Exhibits: <br />Exhibit A -City's Standard Conditions for Public W orks Contracts <br />Exhibit B -Proposal Documents <br />Exhibit C -Certificate of Bidder/Contractor Employee Drug Testing Program <br />2. Definitions. Unless otherwise specifically defined in this Documeht; all capitalized terms which are <br />not proper nouns shall have the meanings assigned thereto in the Specifications. <br />3. Project. The project is generally described as: <br />2008 PAVEMENT PRESERVATION PROGRAM -ROOSEVELT BOULEVARD FROM <br />BELTLINE HIGHWAY TO CHAMBERS CONNECTOR (FEDERAL. AID PROJECT #X-STP-2385 <br />(058)) <br />4. Work to be Performed. Contractor agrees to furnish, as the "Work" all services, labor, materials <br />and equipment which are.described as the Contractor's responsibility in the Plans and Specifications, <br />as the same may be modified in accordance with the Contract, and to construct the improverrient <br />ORIGINAL <br />Public Improvement Contract for Use with Oregon Standard Specifications -Page 1 <br />(Revised February 2004) <br />