n 'Run Date: 09/02/2008 08:41:25 City of Eugene <br /> Est imate Distributi on <br />st Estimate: PPP Roosevelt- Base Bid Alt - ES <br />Job #: 93-004479 PPP-Roosevelt Blvd from Chambers to Be ltline Hwy <br />Line No. Description Quantity Unit Unit Price Amount <br />0550. MH REM/REPL FRAME/COVER-ST 3.00 EACH $275.00 $825.00 <br />0560. PAVEMENT REMOVAL 50,006.00 SQFT $0.90 $45,005.40 <br />0570. SURFACING STABILIZATION 96.00 CUYD $115.00 $11,040.00 <br />0580. COLD PLANE PVMT REMOVAL, 0"-2" DEEP 6,20.0.00 SQFT $0.21 $1,302.00 <br />0590. COLD PLANE PVMT REMOVAL, 1" DEEP 88,000.00 SQFT $0.08 $7,040.00 <br />0600. COLD PLANE PVMT REMOVAL, 2" DEEP 31,100.00 SQFT $0.05 $1,555.00 <br />0610. COLD PLANE PVMT REMOVAL, 2.5"DEEP 77,150.00 SQFT $0.02 $1,543.00 <br />0620. COLD PLANE PVMT REMOVAL, 3" DEEP 121,500.00 SQFT $0.02 $2,430.00 <br />0630. LEVEL 3, 1/2" DENSE HMAC 5,542.00 TON $68.00 $376,856.00 <br />.0640. LEVEL 3, 3/4" DENSE HMAC 3,000.00 TON $68.00 $204,000.00 <br />0650. CONCRETE CURBS 10.00 FOOT $37.00 $370.00 <br />0660. CONCRETE CURB AND GUTTER 42.00 FOOT $32.00 $1,344.00 <br />0670. CONCRETE WIDE CURB AND GUTTER 240.00 FOOT $37.00 $8,880.00 <br />0680. CONCRETE WALKS 642.00 SQFT $7.00 $4,494.00 <br />0690. TRUNCATED DOME TEXTURING 24.00 SQFT $26.00 $624.00 <br />0700. TUBULAR MARKERS 19.00 EACH $55.00 $1,045.00 <br />0710. PAVEMENT LINE REMOVAL 535.00 FOOT $2.00 $1,070.00 <br />0720. PAVEMENT LEGEND REMOVAL 6.00 EACH $75.00 $450.00 <br />0730. PVMT LEGEND, TYPE A2 or B: ARROWS 12.00 EACH $175.00 $2,100.00 <br />0740. PVMT LEGEND, TYPE A2 or B: BICYCLE LANE SYMBO 4.00 EACH $175.00 $700.00 <br />0750. PVMT LEGEND, TYPE B: LIGHT GREEN BIKE LANE 500.00 SQFT $7.00 $3,500.00 <br />0760. MONO-DIRECTIONAL CRYSTAL TYPE Z MARKERS 39.00 EACH $5.00 $195.00 <br />0770. BI-DIRECTIONAL YELLOW TYPE I MARKERS 390.00 EACH $5.00 $1,950.00 <br />0780. THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED 1.00 LUMPSUM $38,500.00 $38,500.00 <br />0790. REMOVE EXISTING SIGNS 1.00 LUMPSUM $109.00 $109.00 <br />0800. LOOP DETECTORS INSTALLATION 15.00 EACH $390.00 $5,850.00 <br />0810. PERMANENT SEEDING 260.00 SQFT $0.63 $163.80 <br />0820. TOPSOIL 5.00 CUYD $83.00 $415.00 <br />0830. ITEM DELETED 0.00 EACH $0.00 $0.00 <br />Total Stage 2- Sta 97+60 to Beltline $810,968.20 <br />to Total PPP-Roosevelt Blvd from Chambers to Beltline Hwy $1,677,137.85 <br />P-:PPP-Roosevelt Blvd from Chambers to Beltline Hwy - Other / Direct <br />General <br />0010. CONTINGENCY 20~ of Contract $335,427.57 <br />0020. PAVEMENT TESTING 2~ of Contract $33,542.76 <br />0030. Advertising 1.00 LUMPSUM $200.00 $200.00 <br />0040. Printing 1.00 LUMPSUM $500.00 $500.00 <br />0050. Consultants 1.00 LUMPSUM $10,100.00 $10,100.00 <br />0060. ODOT admin costs 1.00 LUMPSUM $15,000.00 $15,000.00 <br />Total General $394,770.33 <br />to Total PPP-Roosevelt Blvd from Chambers to Beltline Hwy - Other / Direct $394,770.33 <br />P-:PPP-Roosevelt Blvd from Chambers to Beltline Hwy - Miscellaneous <br />General <br />0010. Engineering Charge 1.00 LUMPSUM $452,500.00 $452,500.00 <br />0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $2,500.00 $2,500.00 <br />Total General $455,000.00 <br />to Total PPP-Roosevelt Blvd from Chambers to Beltline Hwy - Miscellaneous $455,000.00 <br />to Total PPP Roosevelt- Base Bid Alt - ES <br />$2,526,908.18 <br /> <br />