(Add) Mulch shall be Seeding Compost Mulch or approved equivalent. <br />01030.16(c) Tackifier <br />(Add) Tackifer shall be Lane Forest Products "Bio-weave", Rexius "Microblend", or approved <br />equivalent. <br />01030.44 Topsoil and Wetland Topsoil <br />(Add) "Prepare subgrade to receive topsoil and..." to the beginning of the first sentence. <br />01030.46 Area Preparation <br />(Add) Prepare all areas per Method "C". <br />01030.48 Seed Application <br />(Add) Apply seed, fertilizer, mulch, and tackifer using Method 5. Apply seed at rate of 2 Ibs/ <br />1000 sq. ft. <br />01030.62(b)(4) Mowing <br />(Delete) No mowing is required as part of this Contract. Otherwise establish seed as specified. <br />01040.14 Topsoil <br />(Add) Topsoil shall be Selected Native Topsoil taken from areas within the project limits. All <br />Selected Native Topsoil shall be approved by the Project Manager prior to use. If <br />insufficient onsite materials exist topsoil shall be imported Sandy Loam Topsoil per <br />1040.14(b)(3). Submit test reports for any topsoil per 1040.04(a)(3), <br />01040.43(c) Hauling and Spreading <br />(Add) Place specified topsoil to a minimum 6" depth in all areas. Place specified topsoil in <br />repair areas to depths required to meet surrounding or adjacent existing conditions. <br />Ensure soil is lightly compacted to prevent future settling. <br />01040.48 Planting Area Preparation <br />(Delete) Irrigate the prepared area for two weeks prior to planting to germinate unwanted seeds. <br />01040.48(c) Method "C" <br />(Delete) First sentence of second paragraph. <br />01040.81 Topsoil and Wetland Topsoil <br />(Replace) Entire subsection with the following: <br />Topsoil not taken from required excavations will be measured by the ton in the hauling <br />vehicle, according to 00190.10. <br />Special Provisions -Job #4376 Page 19 <br />