New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4376 Contract 2009-00006 w bid docs
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN 4376 Contract 2009-00006 w bid docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:46:06 PM
Creation date
9/8/2008 2:24:32 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004376
GL_Project_Number
965374
Identification_Number
2009050135
COE_Contract_Number
2009-00006
Retention_Destruction_Date
12/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0/15/2009 12:48 FA}f 541 682 3366 CITY EUGENE P14 ENG ; OEITA CONSTRUCTI 0 043/009 <br />,~~ . •= <br />.S <br />paid for one time at each location. Any other saweutting by the eotttraetor is incidental to the <br />corresponding work and no additional payment will be made. <br />(ADD) 00330.XZ Borrow Material -Imported borrow materials may supplement borrow materials <br />originating from required excavations upon approval by the Engineer that on-site materials have <br />been used as far as practical. <br />(ADD) 00330.$3 Imported Borrow ,Required imported borrow materials will be measured by the ton <br />in the hauling vehicles, according to 00190.10. <br />(ADD) 00330.95 Imported Borrow -Accepted quantities of required imported borrow materials will <br />be paid for at the Contract unit price per ton. <br />(REVISE} 00754.90 General -The sentence that begins "Costs subntted by the Contractor for "Asphalt <br />Cement in HMAC Per Ton Of I-IZVIAC Complete" should read: <br />Costs submitted by the Contractor for "Asphalt Cement in HMAC Per Ton Of 1~MAC <br />Complete", for any IDVIAC bid item, over thirty-five (35) dollars per ton will be considered <br />unbalanced and the bid will be rejected. <br />(REPLACE) 00990.90 General -- )?ay Item (k) with "J'unction Box, Type _" <br />{REPLACE) 00990.90 General -Replace the notes added by Special Provision for item (j) as follows: <br />Item (j) includes payment for furnishing and installing conduit as identified in the plans for <br />future detector loops and interconnect_ No electrical wire will be installed as part of this item. <br />(REPLACE) 00990.90 General -Replace the notes added by Special Provision for item (k) as follows: <br />Item (k) includes payment for furnishing and installing junctiorx boxes as identified in the plans <br />for future detector loops and interconnect. No electrical wire will be installed as part of this <br />item. <br />(ADD) 00990.90 General -The following note after the paragraph that begins "Item (j) includes": <br />In Item (k) above the type of Junction Box to be installed will be inserted in the blank. <br />(ADD) 01030.90 General - Add the following Pay Item (previously deleted by City Amendment}: <br />Pa, l~tem Unit of Measurement <br />(i) Seeding 1V~obilization ...............................................Each <br />(REVISE) 01030.90 General -The note that begins "Item (a) includes all labor and transportation of <br />materials and equipment" should begin "Item (i) includes,.,," <br />(ADD) 01040.43{c) Hauling snd 5preading -Topsoil shall be brought to grade of new and existing <br />sidewalk and new curb spillways prior to the appIieation of permanent seeding. <br />CIiANGES Tp PLA1~15: <br />(REVISE) Sheet 2B Grassy Bio-Swale Detail -The note that reads " 3" Mulch as Specified (Typ.)" shall <br />be revised to "1/2" -1"Depth of Mulch as Specified (Typ.)." <br />Addendum No. 1-Job #4376 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.