~, <br />AUGUST 12, 2008, 2:00 P.M. <br />TO THE CITY MANAGER <br />EUGENE,OREGON <br />The undersigned Bidder declares: <br />CITY OF EUGENE <br />PROPOSAL <br />JOB #4571 BID NUMBER 23 <br />BIDDER: ~ ~ ~ CD ~ ~ /1 ~ <br />That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included <br />in the Book of Contract Documents and Specifications for this job which includes but is not limited to the Plans, City <br />Standard Specifications and Standard Drawings, Supplemental Specifications and Special Provisions, and City of Eugene <br />Amendment #3, #4 and #5, Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br />ROBIN HOOD AVENUE <br />STORM MODIFICATIONS <br />CAPITAL IMPROVEMENT PROJECT <br />That Bidder has made an examination of the site of the proposed work and has made such investigations as are <br />necessary to determine the character of the material and the conditions to be encountered, independently of the indication <br />on the plans; and that if the Proposal is accepted, Bidder will contract with the City of Eugene as provided in the Contract <br />Form, will to the extent of this bid, provide the necessary machinery, tools, apparatus, and other means of construction, <br />and will furnish all material and labor as specified, or called for by the Plans or necessary to complete the work in the <br />manner specified and in accordance with the requirements of the Engineer. <br />The undersigned also agrees that Bidder will order all material and equipment included under this contract and <br />will commence work within five (5) days after receipt ofNotice to Proceed and that Bidder will complete the work in all <br />respects after commencement and will have the project completed BY OCTOBER 1.2008 and that Bidder will pay as <br />liquidated damages to the City for any delay, the sum of TWO HUNDRED DOLLARS ($200.00) per day for each day <br />required beyond that period. <br />PROPOSAL -JOB #4571 PAGE 1 of 3 <br />