New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4571 Contract 2009-00004 w bid docs
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN 4571 Contract 2009-00004 w bid docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 11:17:28 AM
Creation date
9/8/2008 1:46:14 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004571
GL_Project_Number
995226
Identification_Number
Req 2009050135
COE_Contract_Number
2009-00004
Retention_Destruction_Date
11/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
00225.80 Measurement <br />00225.80 General <br />Method "B" -Lump Sum Basis - No measurement of quantities will be made. <br />Measurement and payment for furnishing, installing and removing temporary <br />signs, flaggers and temporary construction orange plastic mesh fence shall be <br />included as incidental in the payment for the item "TEMP WORK ZONE TRAFFIC <br />CONTROL". <br />Local access must be maintained during all work. If the Contractor proposes to <br />block driveway access, notices shall be given to the property owner one day prior <br />to blocking the driveway. Driveway access shall be available to all property <br />owners and tenants each day, at the end of each shift. <br />The Contractor shall place HMAC or cold mix over unpaved areas used to route <br />public traffic during construction to provide a smooth firm driving surface. All <br />costs of providing a smooth firm driving surface shall be incidental to the <br />temporary protection direction item. <br />00225.90 Payment <br />00225.90A Method "B" -Lump Sum Basis -Payment for the item "Temporary Work Zone <br />Traffic Control, Complete" will be made at the contract lump sum amount and <br />will be for furnishing, installing, moving operating, maintaining, inspecting, and <br />removing materials and TCD, and for furnishing all equipment, labor, and <br />incidentals necessary to complete the work as specified. <br />00320.00 Scope <br />(ADD) The Contractor shall protect existing landscape shrubs and trees adjacent to <br />improvements. Where improvements conflict with shrubs and trees the <br />Contractor shall prune shrubs, branches, and roots, with approved pruning <br />devices, making clean cuts and not leaving split or frayed ends. <br />00320.42 Ownership and Disposal of Matter <br />(ADD) Trees marked for removal shall be cut and offered to adjoining property owners. <br />Wood not claimed by adjoining property owners shall become the property of the <br />contractor. <br />00470.19 Water Quality Manholes <br />(ADD) Furnish water quality manholes meeting the following criteria: <br />(a) Water Quality Manhole Performance -Water quality manholes shall meet the <br />following design criteria: <br />Water Peak <br />Quality Conveyance <br />Flow Flow <br />Rate (25-Year Q) <br />(cfs) (cfs) <br />0.541 8.61 <br />Special Provisions -Job #4571 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.