SPECIAL PROVISIONS FOR <br />ROBIN HOOD AVENUE STORMWATER MODIFICATIONS <br />JOB #4571 <br />00120.15 Examination of Work site and Solicitation Documents; Consideration of <br />Conditions to be Encountered <br />(ADD) Inquiries regarding the plans, specifications, and Contract documents shall be <br />made to: Joe Ramirez (541) 682-5228. <br />00150.50 Cooperation with Utilities <br />00150.50(a) General <br />(ADD) Coordinate with Assembly of God Church for construction activities including <br />removal of the existing storm line from Manhole #84652 to the existing inlet. <br />Installation of the pollution control manhole shall be done in the same day with the <br />removal of this storm line. <br />Add the following Subsection: <br />00180.40(c) Specific Limitations -Limitations of operations specified in these Special <br />Provisions include, but are not limited to, the following: <br />Limitations <br />Subsection <br />Cooperation with Other Contractors .......................... 00150.55 <br />Final Completion Time .............................................. 00180.50 <br />Right-of-Way and Access Delays .............................. 00180.65 <br />Traffic Restrictions ................................................... 00220.40 <br />Noise Control ...................................................... 00290.30(d) <br />Be aware of and subject to schedule limitations in the Standard Specifications that are not listed <br />in this Subsection. <br />00180.50(h) Contract Time -Complete all Work to be done under the Contract before the <br />elapse of 30 Calendar Days, or not later than October 1, 2008, whichever occurs first. <br />00180.65 Right of way and access delays -The easements marked on the plans are in <br />the process of being acquired. The City has a right of entry agreement from the Assembly of God <br />Church to use only the areas necessary to install the storm water system and to complete any <br />work related for restoration. <br />00180.85(b) Liquidated Damages -Add the following paragraph: <br />The liquidated damages for failure to complete the Work on time are $200.00 per Calendar Day*. <br />* Calendar Day amounts are applicable when the Contract time is expressed on the Calendar <br />Day or fixed date basis. <br />00190.20(f-2) Scale Without Automatic Printer -Add the following sentence after the first <br />paragraph: <br />Pay costs for the weigh witness at $35.00 per hour. <br />Special Provisions -Job #4571 Page 1 <br />