CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order Job # 4559 <br /> Contrail # 2009-03 <br />CONTRACTOR: 2G Inc., dba 2G ConsWilion Change Order # 1 <br />(ADDRE33) PO Box 11735 Dale: 07M22l09 <br />Eugene, OR 97440 CAMS Daie: <br /> Reviewed by. Dete: <br />PROJECT: Delta PorMs Boardwalk ofl Goodpasture Island Road Inspector. 0. Root <br /> Civil Engineer T. Higgins 'i9t <br /> Proj. Mgr. C. Mueller <br /> Principal Eno. M. Cahill <br />You are directed to make the following changes in this contract: <br />Contract <br />Contract <br />Item <br />No. Item Time <br />Change Quantity <br />(Units) UNt <br />Cost <br />Amount <br />(+/- Amended <br />Change Net <br />Change <br />40 Delete -Rail Or Inal 225.00 FT 51.37 11558.25 (;11,558.25) <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 .00 .00 0.00 <br />60 Delete -Turtle fence Inal 110.00 Fr 118.98 13 087.80 (;13,067.80) <br /> Revised 0.00 .00 0.00 <br /> Amended 0.00 .00 ;0.00 ;0.00 <br />90 Delete -Turtle Fence Gate Ori final 1.00 EA 7.00 627.00 (;527.00) <br /> Revised 0.00 0.00 .00 <br /> Amended 0.00 0.00 .00 0.00 <br /> Ori Inal 0.00 0.00 .00 ;0.00 <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 ;0.00 .00 0.00 <br /> Inal o.oo o.oo .00 w.oo <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 .00 0.00 0.00 <br /> final 0.00 .00 0.00 ;0.00 <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 .00 0.00 0.00 <br />The original contrail work days are 0.0 da <br />The contrail time change this C.O 0.o da <br />The contrail time change by previous C.O.'s D.o da <br />The new contrail work da are 0.o da <br />The original contract sum was <br />..~.._.........._._.__-._...____.__.__.---._..._..___._... _.__._._._.~.w...._ <br />Net change by previous change orcler <br />Net change due to amendment by previous change order _ ~ _ _ ~ ~~ <br />The contrail sum prior to this diange order was .._ ...__.T~ <br />This diange order will change contrail sum by this amount ~~_ _ <br />The new conUact net change sum _,._,_,.. _ <br />The new contrail amendment sum __ _ __ <br />The new contrail sum inducting this change orderwill be _,,,~,,,_,,,__ _~~~ _~. ___. <br />Percents a of o anal contrail <br />NET CHA E DU TO AM N MENTS <br />Approval by: ~N.~j~ <br />City Engineer ~cA~ U <br />~°fi'tiD~ <br />Date <br />CONTRACTOR ~ OFFICE FILE <br />5230.874.35 <br />E0.00 <br />E0.00 <br />E230,874.35 <br />1;z5,z73.os) <br />(525,273.05) <br />E0.00 <br />E2o5,aot.3o <br />-tn.ssx <br />o.oovs <br />Prime Contractor Third Party <br />Date Date <br />PURCHASING/CRO <br />O)FORMSWROJECTLCONSTREVISEDCHANGE ORDERJCLS <br />This changes the bid items as follows: <br />