' OREGON DEPARTMENT OF TRANSPORTATION <br />Local Road and Street Finance Queatioaaaire <br />FOR FISCAL YEAR ENDING JUNE 30, 2002 <br />IV. EXPENDITURES ON CLASSIFIED AND LOCAL ROADS AND STREETS <br />City Eugene <br />Classification: Miles <br />319 Local Roads on the Natioaal Highway System 2.36 <br />AMOUNT <br />1. CAPITAL OUTLAY <br />Construction, Expansion and Preservation <br />a. Right of Way ................................................................. <br />b. Construction Engineering <br />1) Capital Improvement Plan Development... <br />2) Preliminary Engineering ......................... <br />3) Construction Engineering ........................ 1 , ~ 5 3 <br />c. Construction and Expansion <br />1) Road .......................................................... <br />2) Bridge ...................................................... <br />d. Repair and Preservation <br />1) Road .......................................................... 9 4 3 <br />I <br />2) Bridge ........................................................ <br />TOTAL CAPITAL OUTLAY ................................. $ 2 , '~~ 9 6 <br />2. MAINTENANCE $~G..~I„ 2,~,,b/total„miles=her mile $. $35,925 <br />Line item totals on these part IV pages must equal that Iine item total on part II, <br />disbursements for road and street purposes, for Capital Outlay only. <br />RETURN TO: <br />Verne Deplois <br />Oregon Department of Transportation <br />Cost Allocation and Analysis Unit <br />550 Capitol Street NE <br />Eugene Survey FY2001 E Local NHS 8/09/2002 <br />