• , i <br /> r~ nf <br /> B1}~C•L~1 ~ ~f3~~S ~S _Vl V~7 ~~T ~ ~1~ _ _ _ _ _ Pa ego 63 i <br /> <br /> 03/17/2008 12:14:33 PM S • ~ ~I <br /> Project Billed Acti- Total Amount Billed <br /> Billed ~ vi TranDate TranId Resource Employed uanti Amount Transaction Remark <br /> 0431 Jake's Place (4451) $675.88 $675.88 <br /> 3636213 Materials Testin¢ 6$ 75.88 $675.88 <br /> 285C Base aggregates quality controf (CE) $152.50 $752.50 <br /> 02/06/2008 HI356054 Engineering Technician 2 1 L-H $70.00 C/G BASE DF'S <br /> 02/06/2008 H1356054 PASSENGER VANS 1 H $6.25 C/G BASE DF'S <br /> 02/13/2008 I1356064 Engineering Technician 2 1 L-H $70.00 BASE AGG DF'S <br /> 02/13/2008 I1356064 PASSENGER VANS I H $6.25 BASE AGG DF'S <br /> 286C Aspha&ic concrete quality control (CE) $256.50 - $256.50 <br /> 02/14/2008 I1374055 Engineering Associate 3 L-H $240.00 AC TESTING <br /> 02/14/2008 I1374055 CARGO VANS 3 H $16.50 AC TESTING <br /> 287C PCC quality control (CE) 5190.63 $190.63 <br /> 02/07/2008 H1356085 Engineering Technician 2 2.5 L-H $175.00 C/G PCC TESTING <br /> 02/07/2008 H1356085 PASSENGER VANS 2.5 H $15.63 C/G PCC TESTING <br /> 322-7 Concrete sample pickup 576.25 576.25 <br /> 02/08/2008 H1356096 Engineering Technician 2 I L-H $70.00 P/U PCC CYLS. <br /> 02/08/2008 H1356096 PASSENGER VANS I H $6.25 P/U PCC CYLS. <br /> <br />