CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR: Wlldish Conttnrc8on <br />(AOixtESS) Po Box 7aza <br />Eugeno OR 97401-0248 <br />PROJECT: 2008 Pavement Preserva0on Progrem 1) Chad Dr. from E. end of end to <br />Coburg Rd (Job #4423) 2) Barger Dr from Primrose to Tarty St (Job #4433) <br />3) Barger Drive from Hwy 99 to Altkrront St (Job #44831 <br />You are directed to make the following changes In this contract: <br />r..,~,~~ <br />Job # 4423 4433, 4483 _ _ <br />c«,tregt # 2ooe-22 <br />Change Order # 1 <br />Date: o7rolroa <br />CAMS Dale: <br />Reviewed by: Date: <br />Inspector: D. Keolev <br />K. MarwOz <br />Prof. Mgr. M Rodrigues <br />Principal Eng. P. Kboa <br />Item <br />No. <br />0131 Job #4423 Chad Drive - rice ad stment - <br /> <br />0132 Job #4423 Chad Drive - As a0 ad tmMt • June <br /> <br />0231 Job 14433 ea Dr. St. - As k rice a ustment -June <br /> <br />0141 Job #4483 Ba OrJH 99 - k a stment -June <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This changes the bid items as follows: <br />Jtem <br />No. itertt Time <br />Change Quantity <br />Units Unlt <br />Cost <br />Amount <br />+l- Amended <br />Chan a Net <br />Change <br />0131 1/2' Lev 2 HMAC Prke adJusbneM -May Inal 0.00 .00 .00 SO.00 <br /> (Job 14423) Revised 0.00 .00 .00 <br /> ArtrerWM 2 594.15 mns 230 5966.55 5966.55 <br />0132 1J2' Lev 2 HMAC Pratt adJustment -June nal 0.00 0.00 0.00 ;0.00 <br /> (]ob 14423) Revised 0.00 0.00 0.00 <br /> Artrended 1242.62 mM 4.53 5629.07 5629.07 <br />0231 1/2' Lev 2 HMAC Prke adJusbnent -June nal 0.00 0.00 0.00 50.00 <br /> gob ~C4433) Revised 0.00 .00 0.00 <br /> Amended 2 931.00 tons .53 513 277.43 13 277.43 <br />0141 l f2' Lev 2 HMAC Prke adjusi,nent -June nal 0.00 .00 0.00 50.00 <br /> (]gb 14483) Revised 0.00 .00 .00 <br /> Amended 1261.72 tons .53 5 715.59 5 715.59 <br /> nal 0.00 .00 .00 x.00 <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 .00 .00 0.00 <br /> nel 0.00 .00 0.00 50.00 <br /> Revised 0.00 .00 0.00 <br /> AmerMed 0.00 $0.00 50.00 .00 <br />The original contract work days are 0.0 da <br />The contract rime change this C.O o.o da <br />The contrect time change by previous C.O: s o.o da <br />The new contract work da are 0.0 de <br />The original contract sum was ,,,,„,~.,.,.....,, _....__~. __._..._.._.____~___._ <br />Net change by prevbus change order .~„.,,____..._....__.....____ _..........__~...___._._ <br />Net change due to amendment by previous change order ~ __~,_~___,_,__,_.,,__,._._.__~.. <br />The contract sum prior to this change order was ,_„_,_.____._____._.___._~..______....___._......_____ <br />__---._ <br />This change order will dtange contract sum by this anaunt _________,_,,,_,_,_,____._..____...........__._..__..~ <br />The new contract net change sum „„_..._._..__...._.__..__._.___._...____..._.__._...._~ <br />The new contract amendment sum ~~~__._. __..._....~..__...._.____...__.._~..__ <br />The new contract sum including this change order will be _,___„ ~,,,,,~_,,,,,_,_,_„.,~..,..„,_._.____....._._....... <br />Percentage of original contract _ _..r________.__......_.___......._._ <br />r CHANGE DUE TO AMENDMENTS ~^ <br />Approval by: <br />~ MS <br />City Engineer <br />~I~sl6~ <br />5926.017.00 <br />50.00 <br />so.oo <br />1926,017.00 <br />530,588.64 <br />so.oo <br />530,568.64 <br />5956.605.64 <br />3.30% <br />Prime Contractor Third Party <br />Date <br />Date Date <br />^ CONTRACTOR ^ OFFICE FILE ^ PURCHASING/CRO <br />01Ft>FtMS)PROJECT\CONSTIREVISED CHANGE ORDER.XLS <br />