CITY OF EUGENE
<br />DEPARTMENT OF PUBLIC WORKS
<br />ENGINEERING DIVISION
<br />Change Order
<br />CONTRACTOR: Wlldish Conttnrc8on
<br />(AOixtESS) Po Box 7aza
<br />Eugeno OR 97401-0248
<br />PROJECT: 2008 Pavement Preserva0on Progrem 1) Chad Dr. from E. end of end to
<br />Coburg Rd (Job #4423) 2) Barger Dr from Primrose to Tarty St (Job #4433)
<br />3) Barger Drive from Hwy 99 to Altkrront St (Job #44831
<br />You are directed to make the following changes In this contract:
<br />r..,~,~~
<br />Job # 4423 4433, 4483 _ _
<br />c«,tregt # 2ooe-22
<br />Change Order # 1
<br />Date: o7rolroa
<br />CAMS Dale:
<br />Reviewed by: Date:
<br />Inspector: D. Keolev
<br />K. MarwOz
<br />Prof. Mgr. M Rodrigues
<br />Principal Eng. P. Kboa
<br />Item
<br />No.
<br />0131 Job #4423 Chad Drive - rice ad stment -
<br />
<br />0132 Job #4423 Chad Drive - As a0 ad tmMt • June
<br />
<br />0231 Job 14433 ea Dr. St. - As k rice a ustment -June
<br />
<br />0141 Job #4483 Ba OrJH 99 - k a stment -June
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />This changes the bid items as follows:
<br />Jtem
<br />No. itertt Time
<br />Change Quantity
<br />Units Unlt
<br />Cost
<br />Amount
<br />+l- Amended
<br />Chan a Net
<br />Change
<br />0131 1/2' Lev 2 HMAC Prke adJusbneM -May Inal 0.00 .00 .00 SO.00
<br /> (Job 14423) Revised 0.00 .00 .00
<br /> ArtrerWM 2 594.15 mns 230 5966.55 5966.55
<br />0132 1J2' Lev 2 HMAC Pratt adJustment -June nal 0.00 0.00 0.00 ;0.00
<br /> (]ob 14423) Revised 0.00 0.00 0.00
<br /> Artrended 1242.62 mM 4.53 5629.07 5629.07
<br />0231 1/2' Lev 2 HMAC Prke adJusbnent -June nal 0.00 0.00 0.00 50.00
<br /> gob ~C4433) Revised 0.00 .00 0.00
<br /> Amended 2 931.00 tons .53 513 277.43 13 277.43
<br />0141 l f2' Lev 2 HMAC Prke adjusi,nent -June nal 0.00 .00 0.00 50.00
<br /> (]gb 14483) Revised 0.00 .00 .00
<br /> Amended 1261.72 tons .53 5 715.59 5 715.59
<br /> nal 0.00 .00 .00 x.00
<br /> Revised 0.00 .00 .00
<br /> Amended 0.00 .00 .00 0.00
<br /> nel 0.00 .00 0.00 50.00
<br /> Revised 0.00 .00 0.00
<br /> AmerMed 0.00 $0.00 50.00 .00
<br />The original contract work days are 0.0 da
<br />The contract rime change this C.O o.o da
<br />The contrect time change by previous C.O: s o.o da
<br />The new contract work da are 0.0 de
<br />The original contract sum was ,,,,„,~.,.,.....,, _....__~. __._..._.._.____~___._
<br />Net change by prevbus change order .~„.,,____..._....__.....____ _..........__~...___._._
<br />Net change due to amendment by previous change order ~ __~,_~___,_,__,_.,,__,._._.__~..
<br />The contract sum prior to this change order was ,_„_,_.____._____._.___._~..______....___._......_____
<br />__---._
<br />This change order will dtange contract sum by this anaunt _________,_,,,_,_,_,____._..____...........__._..__..~
<br />The new contract net change sum „„_..._._..__...._.__..__._.___._...____..._.__._...._~
<br />The new contract amendment sum ~~~__._. __..._....~..__...._.____...__.._~..__
<br />The new contract sum including this change order will be _,___„ ~,,,,,~_,,,,,_,_,_„.,~..,..„,_._.____....._._.......
<br />Percentage of original contract _ _..r________.__......_.___......._._
<br />r CHANGE DUE TO AMENDMENTS ~^
<br />Approval by:
<br />~ MS
<br />City Engineer
<br />~I~sl6~
<br />5926.017.00
<br />50.00
<br />so.oo
<br />1926,017.00
<br />530,588.64
<br />so.oo
<br />530,568.64
<br />5956.605.64
<br />3.30%
<br />Prime Contractor Third Party
<br />Date
<br />Date Date
<br />^ CONTRACTOR ^ OFFICE FILE ^ PURCHASING/CRO
<br />01Ft>FtMS)PROJECT\CONSTIREVISED CHANGE ORDER.XLS