Page 2 of 3 <br />From: GALLUP Steve S <br />Sent: Thursday, August 14, 2008 5:07 PM <br />To: JOHNSON Eric P <br />Cc: SMITH Tammy D <br />Subject: FW: 4453 Funding <br />Eric, apparently more curb/ramp work was done on the southeast corner of 6th and High Street in connection with the <br />APS project (about $2,200). From what I recall, this work was to be funded from the curb cut fund. If you approve, inform <br />Tammy to do the fund transfer. Thanks. Steve <br />From: SINGER Doug K <br />Sent: Tuesday, August 05, 2008 9:53 AM <br />To: GALLUP Steve S <br />Cc: RAMIREZ Joe F <br />Subject: 4453 Funding <br />Steve, <br />Please see the emails below. If you remember there was some issues with the grades on the ramp at 6th and High that <br />was poured during the APS project. We designed a sidewalk by-pass to help with the grades. Wildish was mobilized in <br />that area for the Court House street project so we had them do the work. The work needs to be funding from 4453. <br />Can you check the budget for 4453 and get back to me? <br />Doug Singer <br />682-8460 <br />From: RAMIREZ Joe F <br />Sent: Thursday, ]uly 24, 2008 3:59 PM <br />To: SINGER Doug K <br />Cc: CAHILL Michelle R; KLOPE Paul W; SMITH Tammy D <br />Subject: FW: Sidewalk ramp at 6th/High <br />Doug, <br />Could you please verify that you are okay with the cost as described below. The actual costs we feel need to be <br />transfered are $2200.00. Please verify also the GJN of 4453 of which these funds were to be transferred from. <br />Thanks, <br />Joe <br />From: RAMIREZ Joe F <br />Sent: Thursday, July 24, 2008 3:49 PM <br />To: SMITH Tammy D <br />Subject: FW: Sidewalk ramp at 6th/High <br />From: RAMIREZ Joe F <br />Sent: Friday, January 25, 2008 8:00 AM <br />To: SINGER Doug K <br />Cc: CAHILL Michelle R; KLOPE Paul W <br />Subject: FW: Sidewalk ramp at 6th/High <br />8/22/2008 <br />