New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4333 Street Light Construction Notice
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4333 Street Light Construction Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:16:38 PM
Creation date
9/2/2008 4:39:10 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004333
GL_Project_Number
374333
Retention_Destruction_Date
4/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STREET LIGHT CONSTRUCTION NOTICE <br />AGENCY: City of Eugene <br />EWEB DRAWING #: <br />EWEB MAP #: E-17X <br />DATE: June 20, 2008 <br />City of Eugene-PWM (Maintenance) ^ <br />City of Eugene-PWE (Capital and PEPI) <br />Please provide power and connect 8 70 watt HPS street lights <br />These plans are outlined below and shown on the attached drawing: <br />EWEB CONSTRUCTION PLANS <br />~k <br />PROJECT NAME: Lone Oaks Subdivision -Lone Oak Ave, Ross Ln, Justine Ln <br />and Justine Ct. <br />Project # 4333 <br />Developer's Name: Dean Schmidt Eugene Water & Electric Board <br />Telephone #: 541-868-1850 <br />COE Rep's Name: Randal Dale Prepared By: Karl Kreutzer <br />Telephone #: 682-4961 Telephone #: 541-682-8466 <br />Eugene Water & Electric Board <br />Attention: Debbie Crampton <br />Electric Distribution Supervisor <br />REPLY <br />Multiply # of lights by the monthly rate <br />8 lights x rate for 70 Watt Lights = 8 <br />lights x $3.45 = $27.60 <br />1. Connect 8 high pressure sodium street lights as per attached drawing and bill $27.60/month as per <br />EWEB J-4 street light schedule. <br />Preliminary billing is as follows: <br />EWEB to bill Dean Schmidt for the following work: <br />Ditch: $ <br />Duct: $ <br />Other: $ <br />Transfer: $ <br />New Installation or connect/disconnect in same box: $ 191.00 <br />(3 connections x $47 + $50 for travel) <br />Agency: <br />Authorized by: <br />Total: $ 191.00 <br />Eugene Water & Electric Board <br />By: <br />O:\PROJ ECTS\PROJ-3\4333\Correspondence\Other\EWEB\4333-20080619StreetLightConstNtc.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.