New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Oakway Road Closed to Southbound Traffic Oct. 31-Nov. 2
COE
>
PW
>
Admin
>
Public Affairs
>
2000
>
Oakway Road Closed to Southbound Traffic Oct. 31-Nov. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:37:30 PM
Creation date
8/29/2008 2:37:30 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Wastewater
PW_Subject_Public_Affairs
Street/Lane Closures
External_View
No
PWA_Release_Date
10/27/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- ~J ~ i i ~ <br /> ~ - ¦ <br /> October 27, 2000 - <br /> CONTACT: Mike Shields, Project Manager, 682-5560 <br /> Gale Mills, Project Engineer, 954-3833 <br /> From Public Information Section, 682-5523 <br /> FOR IMMEDIATE RELEASE <br /> TRAFFIC ADVISORY <br /> OAKWAY ROAD CLOSED TO SOUTHBOUND TRAFFIC OCT. 31-NOV. 2 <br /> Oakway Road will be closed to southbound traffic between Cal Young Road and <br /> Oakmont for several days during the week of October 30 to allow excavation for a new <br /> wastewater pump station. <br /> On Monday, October 30, crews under contract to the City of Eugene are scheduled to <br /> begin digging up Oakway Road near St. Andrews Drive to reach a large, underground <br /> wastewater pipe. Traffic will be allowed in both directions on Monday, but motorists may <br /> experience delays. Beginning Tuesday, October 31, and continuing for at least three days, <br /> southbound traffic on Oakway will be detoured to alternate routes. Northbound traffic will be <br /> <br /> - allowed through the construction zone, but there may be periodic delays. Local access to homes <br /> in the area will be provided. Through traffic is advised to use Coburg Road as an alternate route. <br /> The City of Eugene is constructing a new wastewater pump station to replace a pump <br /> station built in 1963. Work on the $1.1 million pump station project began in September and is <br /> expected to be completed in March 2001. <br /> i <br /> Public Works • Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> Phone: (541) 682-5262 • FAX: (541) 662-6826 • www.ci.eugene.or.us <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.