i _ i _ i <br /> i <br /> April 25, 2001 <br /> CONTACT: om Larsen, Project Manager, 682-8450 <br /> FE~~ BRIDG <br /> From Public In ormation Section, 682-5523 <br /> FOR IMMEDI TE RELEASE <br /> FERRY STRE T BRIDGE LANES CLOSED THURSDAY NIGHT FOR PAVING INSPECTION <br /> Lane cl sures will be in effect on the Ferry Street Bridge and viaduct Thursday night, <br /> April 26, for p vement inspection. One lane at a time will be closed beginning at 7 p.m. <br /> Thursday and ontinuing until 6 a.m. Friday. <br /> The in pection schedule calls for the right-hand southbound lane to be closed first, <br /> followed by th inside southbound lane. The contractor will then switch to the northbound <br /> lanes. At leas one lane will be open in each direction at all times. <br /> Motori is should watch for signs and traffic control and expect some congestion, <br /> especially in tf~e southbound lanes early in the evening. <br /> The in I pection is part of the acceptance procedure for the recently completed Ferry <br /> Street Bridge roject. If corrective work is needed, additional lane closures will be scheduled <br /> for the repairs <br /> i <br /> <br /> I <br /> Public Works • Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> Phone: (541 j 682-5262 • FAX: (541) 682-6826 • www.ci.eugene.or.us <br /> <br />