Billable Project Costs As Of 01/31/2006 <br /> 02/21/2006 10:09:25 AM <br /> Page 1 of 7~ <br /> Project Billed Acti- Total Amount Billed <br /> Billed BY vi TranDate TranId Resource Employed uanti Amount OperOvhd AdmOvhd Transaction Remark <br /> 0400 EMX-BRT Franklin Corridor (4332) $422.24 $486.24 $908.48 <br /> 3636213 Materials Testine $422.24 $486.24 $908.48 <br /> 287C PCC quality control (CE) $393.12 3'452.71 8845.83 <br /> ~,Ati24/2006 F13560044 Engineering Technician 2 2.5 L-H $57.80 $83.83 pcc-lean base <br /> 01/24!2006 F13560044 PASSENGER VANS 2.5 H $15.00 pcc-lean base <br /> ~9fi125/2006 FI3560045 Engineering Technician 2 2 L-H $46.24 $67 07 pcc-lean base <br /> 1/~ 01/25/2006 F13560045 PASSENGER VANS 2 H $12.00 pcc-lean base <br /> 01/2S/2006 F13560055 Engineering Technician 2 2 L-H $4614 $67.07 pcc- curb & gutter and cyl p,'u <br /> 01/25/2006 FI3560055 PASSENGER VANS 2 H $12.00 <br /> pcc- curb & gutter and cyl piu <br /> ~9R736/2006 F13>60066 Engineering Technician 2 2 L-H $46.24 $67.07 pcc -driveways <br /> 01/26/2006 F13560066 PASSENGER VANS 2 H $12.00 pcc -driveways <br /> 01/26/2006 FI3560076 Engineering Technician 2 2 L-H $46.24 $67.07 pec- pole bases <br /> 01/26/2006 FI3560076 PASSENGER VANS 2 H $12.00 pcc- pole bases <br /> 01/31/2006 613560024 Engineering Technician 2 3 L-H $69.36 $100.60 pcc cyls-cig & Lean base <br /> 0]/31/2006 613560024 PASSENGER VANS 3 H $18.00 pcc cyls-c/g & lean base <br /> 322-7 Concrete sample pickup 829.12 833.53 862.65 <br /> 01/27/2006 F13560097 Engineering Technician 2 1 L-H $23.12 $33.53 p/u pcc cyls cast 1/26106 <br /> 01/27/2006 FI3560097 PASSENGER VANS 1 H $6.00 p/u pcc cyls cast 1/26/06 <br /> <br /> I <br /> <br />