New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Street Projects Start Monday on Ayres Road, North Delta Highway
COE
>
PW
>
Admin
>
Public Affairs
>
2001
>
Street Projects Start Monday on Ayres Road, North Delta Highway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 11:51:59 AM
Creation date
8/29/2008 11:51:59 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
7/12/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i i <br /> July 12, 2001 <br /> CONTACT: Steve Gallup, Project Manager (North Delta Highway), 682-8460 <br /> Brian Genovese, Project Manager (Ayres Road), 682-5343 <br /> I <br /> From Public I formation Section, 682-5523 <br /> FOR iMMED1~ITE RELEASE - 2-PAGE FAX <br /> I <br /> STREET ROJECTS START MONDAY ON AYRES ROAD, NORTH DELTA HIGHWAY <br /> Constr ction is scheduled to begin Monday on major improvements to Ayres Road, North <br /> Delta Highwa , and a portion of north Gilham Road. The work will be done by Delta Sand & <br /> i <br /> Gravel, underlcontract to the Eugene Public Works Department. <br /> i The p oject on Gilham Road from Honeywood to Ayres Road and on Ayres Road from <br /> Gilham Street to Delta Highway includes reconstructing the roadway, adding raised bike lanes, <br /> building sidewlalks, and installing street lighting. The design also calls for curved lanes, raised <br /> colored-concrete intersections and intermittent landscaped medians to calm traffic. <br /> On N~'rth Delta Highway from Green Acres Road to Ayres Road, the project includes <br /> overlaying th existing road with new asphalt, adding bike lanes, building new curb, gutter and <br /> sidewalk on tt~e east side of the street, and installing landscaped medians and street lighting. <br /> <br /> ' Paving work on Delta Highway is scheduled to be completed by the end of September, <br /> and paving o Ayres Road should be done by the end of October. The work in the area of <br /> Gilham and oneywood is scheduled to be completed by the start of school in early September. <br /> Durin construction, portions of Gilham and Ayres roads will be closed to through traffic <br /> for extended eriods of time, and motorists should anticipate detours and delays in the <br /> construction ones. Road work updates will be provided on the City's traffic relief hotline, 984- <br /> 8484, or on the Internet at www.ci.eugene.or.us/pw. <br /> (more) <br /> I <br /> Public Works • Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> Phone: (541 j 682-5262 • FAX: (541) 682-6826 • www.ci.eugene.or.us <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.