- ~ - <br /> 1`~~. EI <br /> C~ek~er4~, 2 01 <br /> CONTACT: Tom Larsen, Traffic Engineer, 682-8450 <br /> From Public I ormation Section, 682-5523 <br /> FOR IMMEDI TE RELEASE <br /> PAVING RE AIRS WILL CLOSE LANES ON FERRY STREET VIADUCT THIS WEEKEND <br /> Warra ty repair work on the Ferry Street Bridge viaduct will close the southbound lanes <br /> at Sixth Aven a beginning at 7 p.m. today. <br /> Thew rk involves repairing the concrete surface at the south end of the viaduct. Work <br /> is scheduled start at 7 p.m. Friday, November 9. All southbound traffic wilt be detoured onto <br /> the Sixth Ave ue exit. The replacement micro-silica overlay must cure for several days and <br /> remain wet fo at least a week, so the viaduct south of Sixth Avenue will remain closed until <br /> Monday mor ing, November 12, and will continue to be kept wet for four more days after the <br /> southbound I nes are reopened to traffic. <br /> This i m is warranty repair work done at no cost to the City. <br /> For c rrent information on road projects in the Eugene area, call the City of Eugene <br /> traffic relief h tline at 984-8484, or on the interest at www.ci.eugene.or.us/pw/traffic. <br /> I <br /> I <br /> j Public Works • Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> <br /> i Phone: (541) 682-5262 • FAX: (541) 682-6826 • www.ci.eugene.or.us <br /> <br />