New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Two Broadway Ash Trees to be Transplanted to Maurie Jacobs Park
COE
>
PW
>
Admin
>
Public Affairs
>
2002
>
Two Broadway Ash Trees to be Transplanted to Maurie Jacobs Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 10:47:53 AM
Creation date
8/29/2008 10:47:53 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
POS
PW_Subject_Public_Affairs
POS
External_View
No
PWA_Release_Date
3/28/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 03/ 8/02 THU 18: 3 FAX 541 682 4882 CITY EUG PWMAINT PW ADMIN X002 <br /> ~ I o o ~ <br /> i <br /> March .2f t, ~ 002 <br /> s <br /> CoM aca; <br /> • Nark Sr yder, Urban Forestry, Parks and Open Space, City of Eugene, 682-4800 <br /> • C enny E raud, Planning and Development, City of Eugene, 682-5536 <br /> • T ~e:rc~se Picado, Public information Specialist, Parks and Open Space, City of Eugene, 682- <br /> 4814 <br /> FOR 11V1111E1)IATE RELEASE <br /> TWO BROADWAY ASH TREES <br /> TO BE tRl4NSPLANTED TO MAURIE JACOBS PARK <br /> In pr ;paration for the reopening of Broadway Street, City of Eugene Urban Forestry <br /> staff, in colts boration with local tree advocates, will excavate two ash trees from their current <br /> locati ~r~ cm I Boadway Street ar~d replant them in Maurie Jacobs Park, along the Willamette <br /> River C:i1y ~ nd private arborist:; assessed all trees affected by the reopening project, <br /> I <br /> deter Wining that only these two trees were small enough to survive the extensive loss of root <br /> syste ~ a ~s ciated with transplanting. The excavation is scheduled for this Friday, March 29. <br /> The t ~ee~ w I be stored for the avening and replanted the next morning on Saturday, March 30, <br /> at9~.m. <br /> ~D i completed, the newly opened stretch of Broadway will be replanted with 54 trees. <br /> City K lanrrin I and urban forestr!~ staff have developed a new design for improving the soil and <br /> planti ig s.re i conditions for the~~e new trees in order to enhance their potential to grow and <br /> thrive <br /> 1=<~r yore information about this transplanting project, call 682-4800. For information <br /> about tree B ~adway Opening project, call 682-5536. <br /> i <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.