New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2002 Summary
COE
>
PW
>
Admin
>
Public Affairs
>
2002
>
2002 Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:20:57 PM
Creation date
8/29/2008 9:14:52 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> r <br /> Ij POS P operty Owners Required to Cut Tall Grass, Weeds 05/15/02 NR <br /> POS S ream Team, Radio Host l lt" Amazon Appreciation 05/31/02 NR <br /> POS Seam Team: Willamette Clean-Up and Picnic 06/07/02 NR <br /> POS roject Playground" at Trainsong Park June 13`" 06/11/02 NR <br /> POS H lp design new skatepark in Bethel June 25 06/19/02 NR <br /> i <br /> POS 2 roadway Trees Transplanted to M. Jacobs Park 03/28/02 NR <br /> i <br /> PWA E gene Public Works Annual Open House on 5/16 05/13/02 NR <br /> PWA P blication details options for preserving Eug. streets 06/24/02 NR <br /> I'I PWE C ncrete from Mall to be Recycled on Broadway 05/15/02 NR <br /> PWE P ving Repairs will limit lanes on Ferry St. Bridge 06/19/02 NR <br /> PWE, astewater system repairs scheduled this summer in 06/28/02 NR <br /> PWW C ntral Eugene <br /> PWE I provement of Royal W. of Terry starts Monday 06/28/02 NR <br /> PWM ncrete Repairs to Close Lane on 8t" this Month 01/10/02 NR <br /> PWM ncrete Paving Repairs to Start 2/11 on E. 29t" Ave. 02/07/02 NR <br /> PWM bserve Warnings as Storm Cleanup Continues 02/08/02 NR <br /> PWM P Begins Massive Cleanup Following Windstorm 02/08/02 NR <br /> PWM e Paving Thurs. And Fri. On 11`" and 13`" Aves. 05/15/02 NR <br /> PWT P oject to Contain Falling Rocks at Judkins Pt. 04/19/02 NR <br /> PWT onstruction to Open Broadway Begins Monday 04/26/02 NR <br /> PWT live St. to Close for Broadway Construction 05/03/02 NR <br /> PWT on: Add 3rd Westbound Lane on I-105 at Delta 05/08/02 NR <br /> PWT ansportation Development Fees to Increase Mon. 05/09/02 NR <br /> PWT icycle Education Classes Take to the Streets 05/14/02 NR <br /> PWT S hedule to Replace Bridge on I-5, S. of Creswell 05/15/02 NR <br /> PWT lected Officials to Hold Joint Hearing 5/29 on WEP 05/23/02 NR <br /> PWT eliminary Master Sight Plan for Eugene Depot 6/6 05/31/02 NR <br /> PWT S'gnal on Willamette and Crest, Work Starts Mon 06/07/02 NR <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.