Billable Project Costs As Of 08/31 /2007 <br /> 09/14/2007 5:07:17 PM ~7 <br /> Project Billed Acti- bl !~7 Page 12 of 134 <br /> Billed By vi TranDate TranId Resource Employed uanti ~ Total Amount Billed <br /> 0423 3636213 186C 08/29/2007 k1374064 Engineering Associate ~ $Amount Transaction Remark <br /> 1 L-H $80.00 ASPHALT TESTING <br /> 08/29/2007 k1374064 CARGO VANS 1 H $5.00 ASPHALT TESTING <br /> 08/30/2007 k1374055 Engineering Associate 4 L-H $320.00 ASPHALT TESTING <br /> 08/30/2007 k1374055 CARGO VANS 4 H $20.00 ASPHALT TESTING <br /> 08/31/2007 k1374056 Engineering Associate 2 L-H $160.00 <br /> 08/31/2007 k1374056 CARGO VANS ASPHALT TESTING <br /> 2 H $10.00 ASPHALT TESTING <br /> 287C PCCquality control (CE) $337.00 $337.00 <br /> 08/09/2007 h13560115 Engineering Technician 2 2 L-H $140.00 C/G PCC TESTING <br /> 08/09/2007 h13560115 PASSENGER VANS 2 H $12.00 <br /> 08/09/2007 h8215085 Engineering Assistant 2 L-H C/G PCC TESTING <br /> 08/10/2007 h1379086 Sr Engineering Associate 1 L-H $90.00 C/G CYLINDERS <br /> 08/10/2007 h1379086 4WD P[CKUPS $90.00 CONCRETE TESTING <br /> 1 H $5.00 CONCRETE TESTING <br /> 322-6 Asphalt sample pickup $60.00 <br /> 08/28/2007 k74120103 Engineering Technician 2 0.8 L-H $60.00 <br /> 08/28/2007 k74120103 3/4 TON DIESEL PICKUP $56.00 HMAC SAMPLE PICKUP <br /> 0.8 H $4.00 HMAC SAMPLE PICKUP <br /> fi <br /> t <br /> <br /> R ` <br /> ~ - r~ <br /> T <br /> <br />