> > .o• ~ <br /> May 19, 2 03 <br /> CONTAC Diane Bishop, Bicycle & Alternative Modes Coordinator, 682-5471 <br /> From Publ c Information Section, 682-5523 <br /> FOR IMM DIATE RELEASE <br /> <br /> i <br /> BIK PATH REPAIRS TO CLOSE SECTION OF NORTH BANK TRAIL THIS WEEK <br /> W ather permitting, the City of Eugene will be repairing a portion of the North Bank Trail <br /> between t e Greenway Bicycle Bridge and the Ferry Street Bridge on Wednesday, May 21. <br /> Repairs wi I require closing the entire section of path between the two bridges all day on <br /> Wednesd y and possibly on Thursday as well. <br /> Be ause of limited space at the repair site, cyclists, runners, and pedestrians will be <br /> detoured t the South Bank Trail between the two bridges during that time. <br /> ~ir~enw~ ~rd~e <br /> w <br /> I11~~? F~I~r Inn <br /> r~ <br /> ~ <br /> I+~i~~+~~ Btu <br /> P blic Works • Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> Phone: (541) 682-5262 • FAX: {541) 682-6826 • www.ci.eugene.or.us <br /> <br />