~. <br /> <br />~~~~ Pro~_ect_ ~os~s _As O~ 0~~~0l~~c~5 <br />l0/18/2001 2.3346 PM ~ ~~~~~ ~~~ <br />Project Billed Acti- <br />Bilted ~ vi TranDate TranId Resource Emplo~d uanti $Amount <br /> <br />0401 EmX -B us Rapid Transit (4063) $462.91 <br />3636213 Materials Tcstina 5462.9] <br /> 286C Asphaltic concrete ryurrlity control (CE) 5142.38 <br /> 09/15/2005 m13560106 EngineenngTechnician2 3.5 L-H $121.38 <br /> 09/15/2005 m13560106 PASSENGER VANS 35 H $21.00 <br /> 287C PCC yuafit~~ control (CE) 5177.18 <br /> 09/06/2005 161930044 Engineer-In-Tranung 1.5 L-H $30.44 <br /> 09/06.'2D05 171570024 Extra Help I S L-H $li O6 <br /> 09/07200> 1619300x5 Engineer-In-Training ? L-H $40.58 <br /> 09/07/2005 171570065 Extra Help ? L-H $20 08 <br /> 09/Z7i2005 o6t9?0044 Eneineer-ln-braining 1 5 L-H $1044 <br /> 09/28'2005 061930045 Engineer-In-Training ? L-H $40.58 <br /> 304C Standby time (CE) 540.8 <br /> 09/27/2005 061930054 Engineer-In-Training I L-H $20.29 <br /> 09/28!2005 0619>0055 Engineer-Lt-Training I L-H $20.29 <br /> 311-6 Asphalt sample pieknp 572.80 <br /> 09/15;'_005 m13560076 Engmeenng Technician 2 2.5 L-H $57.80 <br /> 09/15%2005 m13560076 PASSENGER VANS 25 fI $1500 <br /> 322-7 CO11CJ'C'te S(Iniple p%Ckl/p 529.97 <br /> 09/072005 175870035 Exha Hclp 1 L-H $9 G8 <br /> 09/292005 061930116 Engineer-In=framing 1 L-H $20 ?9 <br />Total Amount Billed <br />OperOvhd AdmOvhd Transaction Remark <br />$619.19 $1,082.10 <br />$619.19 51,082.10 <br />$176.05 5318.43 <br />$176.05 ac dfs <br /> ac dfs <br />5256.98 5434.16 <br />$gq.19 cancretetesung <br />$21.84 tested concrete cylinders <br />$58.86 concrete testing <br />$29.12 made cylinders 4" <br />$44 15 Concrete tesnne <br />$58 86 Concrete testing <br />558.86 599.44 <br />$29 43 Concrete delayed I hour <br />$29 43 Concrete delayed 1 hour <br />$83.83 SI56.63 <br />$83 83 p'u ac samples antipm <br /> p~u ac samples am-pm <br />543.47 573.44 <br />$14 04 Cylinder Pickup <br />$29 43 concrete sample pickup <br /> <br />Page 1 of 89 <br />