<br /> _........1 <br /> _ _ <br /> i <br /> March 24, 2 06 <br /> CONTACT: Steve Gallup, Public Works Engineering, 682-8460 <br /> From Public Information Section, 682-2739 <br /> FOR IMME IATE RELEASE <br /> Lane Closures on Hilyard Street next week <br /> In pr paration for improvements to Hilyard Street later this year, pothole work on the <br /> edges of Hii and Street between 13~h and 24`h Avenues will start Monday, March 27 and <br /> conclude o Wednesday, March 29t". The contractor will need to close one traffic lane for one <br /> to two hour at a time between the hours of 9 a.m. and 4 p.m. At least one traffic lane will <br /> i remain ope at ail times. <br /> I <br /> The ity has hired Sitework Construction to excavate small holes and trenches about <br /> ~ three feet d ep at eight different locations along the edge of the street. Motorists should expect <br /> to travel at lowers eeds and watch for tr v <br /> p a el lane changes. <br /> i <br /> i <br /> ~ <br /> www.eugene-or.gov <br /> i <br /> I <br /> i <br /> J <br /> P blic Works ~ Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> Phone: (541) 682-5262 • FAX: (541) 682-6826 • vwvw.ci.eugene.or.us <br /> <br />