New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1997 Summary
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1997 Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:20:57 PM
Creation date
8/25/2008 1:45:17 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PWM Dr p-in session July 17 on Hendricks Park 7/1/97 release <br /> tre s <br /> PWE W stewater collection line repairs in southeast 7/2/97 release <br /> Eu ene <br /> ' PWE W rk begins on East Bank trail (PWT?) 7/9/97 release <br /> I <br /> PWE St rmwater system upgrade in Conger Street 7/10/97 release <br /> are <br /> AIR Co struction to block Greenhill Road near 7/11/97 release <br /> Ai ort <br /> PWT Te porary closures of FSB viaduct 7/14/97 release <br /> PWT D ours to begin along bike paths by river 7/18/97 release <br /> (F B) <br /> i <br /> PWE Ni httime lane closures on West 11~" near 7/21/9? release <br /> B ltline <br /> I <br /> PWT W rk continues on FSB project despite 7/21/97 release <br /> pr tests <br /> PWE M jor street project starts on East 24t" Avenue 7/24/97 release <br /> PWT T ird lane added to West 13t" (Madison- 8/1/97 release <br /> shington) <br /> PWE U e new hotline to report construction 8/1/97 release <br /> p llution <br /> PWE S wer work will require lane closures on 8/1/97 release <br /> P airie Road <br /> PWE illow Creek detour shifts as 2nd phase of 8/1/97 release <br /> w rk begins <br /> PWE C nstruction closes portion of Millrace bike 8/4/97 release <br /> p th <br /> PWM 'ds wanted to protect local waterways 8/5/97 release <br /> PWA istlestop Tour visits Eugene (PWT?) 8/7/97 release <br /> PWT T mporary closure of offramp on FSB 8/8/97 release <br /> PWE ork to begin on West 11t" (Charnelton-Polk) 8/14/97 release <br /> <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.