New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3863 LAP/LASW Huling
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3863 LAP/LASW Huling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 7:22:30 PM
Creation date
8/25/2008 11:57:03 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
GJN
003863
GL_Project_Number
975026
Identification_Number
2004011634
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LINE EXTENSION AGREEMENT <br /> W.O. # 03073 <br /> To provide underground electrical service to SCENIC MEADOWS SUBDIVISION <br /> _i <br /> ~ located at WENDOVER STREET: EUGENE requested on FEBRUARY 5.2003 by <br /> Ty HI7LIl~TG ,hereinafter called Developer, in a manner consistent with <br /> policies adopted by the Board of Directors of Emerald People's Utility District, hereinafter called District, it is <br /> mutually agreed that: <br /> i <br /> i <br /> 1. The cost of the Electrical installation, which will provide service to the lot corners of each of 20 lots <br /> of the Subdivision, is X29,123.00 , to be paid in full prior to issuing material or beginning <br /> construction. <br /> 2. All street lights shall be supplied, owned and maintained by the City of Eugene. <br /> ~ 3. The delivery point for electrical service to each lot shall be at a secondary pedestal located in the <br /> Public Utility Easement, near the front corner of each lot. As lots are sold, the Developer shall <br /> communicate requirements for service extensions from the secondary pedestal to each meter to each <br /> buyer in the sales contract. <br /> ~ 4. The Developer shall provide all trenching, conduit, conduit elbows, backfill, and 1/8~' inch <br /> polypropylene pull strings in all conduits to Emerald specifications. The Developer shall install all <br /> material provided by Emerald, including transformer vaults, secondary pedestals, ground rods, <br /> ground rod clamps, and #6 solid copper wire. These materials shall be installed to Emerald <br /> specifications and shall be picked up at Emerald's warehouse at 33733 Seavey Loop Road. Please <br /> <br /> ~ schedule all pickups two working days in advance. <br /> 5. Any changes made to the service characteristics or the District Engineer's design of this service <br /> without prior approval from District may result in additional charges. <br /> 6. Estimate includes $ 350.00 for inspection fees. Included in the inspection fee is the installation of <br /> "mule tape" in all conduits by Emerald's inspector, A33. Utility, using the Developer-installed pull <br /> string. Notify Aaron Brown at (541)995-9445 at least two working days in advance of trenching, to <br /> insure expedient inspection of construction and backfilling of trenches. If additional inspector visits <br /> are required, a $175.00 per visit charge will be billed for each visit. , <br /> ~ ~-io~~ ( - '30 der Ft- rn~te Tip~pe,. ~~A~1A~rWN. <br /> Emerald People's Utili 'strict Customer . <br /> Approved by <br /> L_ Craig An <br /> Engineering Supervisor <br /> na+o•~~-~ ~ ~ Date: G?_C~.~~~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.