Run date: 08/06/2008 16:18:19 ~ Page 2 <br /> City of Eugene <br /> ' Contract Preliminary Progress Payment <br /> Payment No 003 <br />Contractor: WILDISH CONSTRUCTION Original Contract: $977,090.70 <br /> Job #: 93-004417. Current Amount: $977,090.70 <br />Con tract No: 2008-00019 Contract Award Date: 03/27/2 008 <br /> PO #: 2008100380 Completion Date: 09/20/2 008 <br />As sessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br />Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantit Amount <br />AIRPORT-TERMINAL RAMP REHAB <br />Base Bid <br />0000 Liquidated Damages ($1,000.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br />0010 MOBILIZATION $94,000.00 LUMPSUM 1.000 $94,000.00 0.000 $0.00 1.000 $94,000.00 100.00 <br />0020 EROSION CONTROL $3,500.00 LUMPSUM 1 000 $3,500 00 0 000 $0.00 0.800 $2,800.00 80.00 <br />0030 AIRPORT SAFETY AND SECURITY $83,000.00 LUMPSUM 1.000 $83,000.00 0.280 $23,240.00 0.780 $64,740.00 78.00 <br />0040 CONCRETE DEMO AND REMOVAL $9.00 SQYD 7,341.000 $66,069.00 0.000 $0.00 3,634.000 $32,706.00 50.00 <br />0050 HMAC COLD PLANING $8.00 SQYD 1,050.000 $8,400.00 0.000 $0.00 346.000 $2,768.00 33.00 <br />0060 ECONOCRETE $100.00 CUYD 50.000 $5,000.00 0.000 $0.00 0.000 $0.00 0.00 <br />0070 PCC PAVEMENT $76.50 SQYD 7,172.000 $548,658.00 2,794.400 $213,771.60 3,430.400 $262,425.60 M 48.00 <br />0080 ADJUST JUNCTION BOX $500 00 EACH 1 000 $500 00 0 000 $0 00 1.000 $500.00 100.00 <br />0090 HMAC $76.00 TON 600.000 $45,600.00 59.950 $4,556.20 328.710 $24,981.96 55.00 <br />0100 PREFORMED JOINT SEAL $8,00 FT 8,000.000 $64,000.00 2,964.000 $23,712.00 2,964.000 $23,712.00 37.00 <br />0110 OBLITERATE EXISTING MARKING $2 25 SQFT 3,500 000 $7,875 00 0 000 $0.00 2,248.000 $5,058.00 64.00 <br />0120 PAVEMENT MARKING $1.65 SQFT 13,000.000 $21,450.00 118.000 $194.70 1,504.500 $2,482.43 12.00 <br />Alt-3 Concrete Driveway Replacement <br />0160 CONCRETE DRIVEWAY REPLACEMENT $68.00 SQYD 225.000 $15,300.00 0.000 $0.00 242.500 $16,490.00 106.00 <br />Alt-1 High Frequency Demolition <br />0170 MOBILIZATION-RUBBLIZING EQUIPM $4 300 00 EACH 2 000 $8,600 00 0 000 $0 00 1.000 $4,300.00 50.00 <br />0180 PAVEMENT RUBBLIZING $0.70 SQYD 7,341.000 $5,138.70 0.000 $0.00 3,601.000 $2,520.70 49.00 <br /> $977,090.70 $265,474.50 $539,484.69 <br />