New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4474 KSH Construction PMT 1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4474 KSH Construction PMT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2011 11:37:39 AM
Creation date
8/25/2008 9:43:21 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004474
GL_Project_Number
975152
Identification_Number
2008100514
COE_Contract_Number
2008-00032
Retention_Destruction_Date
3/4/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Run Date:~08/05/2008 09:27:01 Page 2 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No 001 <br />Contractor: KSH CONSTRUCTION Original Contract: $926,926.00 <br />Job #: 93-004474 Current Amount: $934,912.60 <br />Contract No: 2008-00032 Contract Award Date: 06/20/2008 <br />PO #: 2008100~'`3'~1~ Completion Date: 02/01/2011 <br />Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br />Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantit Amount Quantity Amount <br /> <br />Golden Gardena Park <br />Golden Gardena - Site work <br />0000 Liquidated Damages ($500.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 O.OD <br />0010 MOBILIZATION $83,590.00 LUMPSUM 1.000 $83,590.00 1.000 $83,590.00 1.000 $83,590.00 100.00 <br />0020 TEMP PROTECTN/DIRECTN $2,000.00 LUMPSUM 1.000 $2,000.00 0.500 $1,000.00 0.500 $1,000.00 50.00 <br />0021 BIKES MERGE SIGN 001 $280.80 EACH 2.000 $561.60 0.000 $0.00 0.000 $0.00 0.00 <br />0030 EROSION CONTROL $8,000.00 LUMPSUM 1.000 $8,000.00 0.500 $9,000.00 0.500 $4,000.00 50.00 <br />0031 BLOW STRAW MULCH-CITY SUPPLIED 001 $495.00 ACRE 15.000 $7,425.00 0.000 $0.00 0.000 $0.00 0.00 <br />0040 DEWATER CHANNEL $1,500.00 DAY 5.000 $7,500.00 0.000 $0.00 0.000 $0.00 0.00 <br />0050 DRAIN PIPE PVC 18" $55.00 LINFT 86.000 $4,730.00 0.000 $0.00 0.000 $0.00 0.00 <br />0060 BOX CULVERT $450.00 LINFT 16 000 $7,200 DO 0.000 $0.00 0.000 $0.00 0.00 <br />0070 DRIVEWAY CURB CUTS $15.00 LINFT 20.000 $300.00 0.000 $0.00 0.000 $0.00 0.00 <br />ooeo CONC. (7") APPROACH APRON $10.00 SQFT 200.000 $2,000.00 0.000 $O.OD 0.000 $0.00 0.00 <br />---- ___ ........... .............,,.. aa.av a~iu e,auu.uvu gs,uou.uu v.vuu qo.o~ ~.~~~ *-._- ---- <br />0100 EMERGENCY ACCESS ROAD $9.50 LINFT 3,000.000 $28,500.00 900.000 $8,550.00 900.000 $8,550.00 30.00 <br />0110 CRUSHED ROCK (1 1/2 - 0) $15.00 TON 1,600.000 $24,000.00 0.000 $0.00 0.000 $0.00 0.00 <br />0120 TEMPORARY TYPE ORANGE PLASTIC $5.00 FOOT 3.00.000 $1,500.00 800.000 $4,000.00 800.000 $4,000.00 267.00 <br />0130 BOULDERS, CLASS 300 $75.00 TON 40.000 $3,000.00 0.000 $0.00 0.000 $0.00 0.00 <br />0140 RIP RAP LOOSE, PLACED $20.00 TON 320.000 $6,400.00 0.000 $0.00 0.000 $0.00 0.00 <br />0150 EMERGENCY ACCESS RAMP $1,200.00 EACH 4 000 $4,800.00 0.000 $0.00 0.000 $0.00 0.00 <br />0160 MULCH PATH - CONSTRUCTION $1.20 SQFT 23,880.000 $28,656.00 0.000 $0.00 0.000 $0.00 0.00 <br />0170 STREAM STABILIZATION $4,000.00 FRCACCT 1.000 $4,000.00 0.000 $0.00 0.000 $0.00 0.00 <br />0180 FINISH GRADING - GGP $15,000.00 FRCACCT 1.000 $15,000.00 0.000 $0.00 O.ODO $O.DO 0.00 <br />0190 COMPOST MULCH $35.00 CUYD 360.000 $12,600.00 D.D00 $0.00 0.000 $0.00 0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.