. - <br /> TASK ORDER 02-2 <br /> CONSTRUCTION OF RECREATION FACII~ITIFS AT AMAZON CREEK WETLANDS <br /> RESTORATION PROJECT <br /> <br /> . eferences: ~ . <br /> 1. Cooperative Agroerr~nt (Amendmart No. 1, September 28, 2001, enclosure 1) betwean the ' <br /> U.S. Army Corps of Engineers (Corpse Portland District and the City. of Eugene, Oregon,. (the <br /> City) for acquisition of native plants and seeds and Gaon of recreation facilitics at the <br /> ' Amazon Creek Wetlands Restoration, Section 1135 Project <br /> 2. Project Cooperation Agroesnent (Amardrnaut No.1, September 21, 2001, eaclo.~ure 2) behwem <br /> the Department of the Army and the City of Eugene, Oregon, for Modification of Amazon Creek <br /> Flood Caitrd'Channel, Amazon Creek wetlands Reestoration <br /> ~tequesting; Aa~v: U.S. Army Carps of Engmoers, Portland I~stdct <br /> Suvicina A¢encw: City of Eugene, Oregon <br /> ' of Services: Under this task cedar the City of Eugene wfil oonshuct the plaanod <br /> re~ioa facs~ities at tha project as descn'bcd in the Prajoct Cooperation Agiuat~ (PCA, refereax <br /> • 2 above The recxeation facilities will support public axes and provide tavironmeatal education ' <br /> and infiapretive opportuirities in loaeping with the primary wethund restioration purpose of the ppaja~ <br /> area In 2041, the Corps cbtnpleted plans and spoci (P&S) fa the plazmod recreation <br /> . facilities. The Pd~S verse provided m the City and to Oregon Deparhneot of 1~ottatian for ~ . <br /> inclusion in a larger contract that the city is ~ fat the F.ugcae to Fem Ridge multiple <br /> . purpose trati. The contract was previously awarded by Oregon Department of Tkansportation in <br /> 2001. Construction will be initiated in of 2002 and w~71 continue through 2003. The city <br /> wi71 manage the construction contract and w~71 complete canstivcticn of aU facilitics with Section <br /> 1135 funding by the end of Federal Fiscal Year (FY) 2003. <br /> This Task Order covers wok to be completed m Fodaral Fiscal Year (FY) 2002. A separate task ' <br /> order will be prepared to cover work con~kted in FY 2003. - <br /> Tasks aid Activities: ~ . <br /> . The Corps of Engineers Will: . <br /> 1. In accordance with the cyst <br /> sharing provisions detailed in the Projcct~Cooperation A,t <br /> (PCA~ reimburse the City for the Federal share of the recreation facilitics cow by the city. ' <br /> The Federal share is descxi'bed below under "Reimbursement of Services." <br /> 2. Provide any additional engineering during construction that may be required for the facilities <br /> previously designed by Corps staff <br /> 3. •Perfozm interim inspections (roughly twice monthly) during active construction periods. The . <br /> puiposc of the inspections is to provide quality ~ on those facilities for which the Corps <br /> will share costs. . <br /> 1.. <br /> <br />