Accounts Receivable Worksheet <br /> City of Eugene-Public WorksTrensportaUon Billin For: Date: /U / Q <br /> Lazo Rooseven e~vd. Dama a to Ci of Eu ene, Ore on Pro e <br /> Eugene, OR 87102 Responsible Parly: PWE -Attn: Rei~er~a-- CC_ <br /> Charge: " - PrGU ,ryl <br /> Location: CheckermallowParklingLot f GD 2 2004 <br /> Descri lion: Made si ns for PWE, ro'ect #4136 <br /> Account Code: 131-9425-47947 <br /> LA <br /> Hourly Fringe Base Hours Total Subt tale <br /> Employee Rate + Rates = Rate X Worked <br /> AFSCME Em to ees: 35.35% <br /> Ed Lee 18.00 6.36 24.36 4.00 97.45 Total Wa es 503.15 <br /> Brian Haxb 17.20 6.08 23.28 4.00 93.12 <br /> Brandon Be rlin 17.20 6.08 23.28 4.00 93.12 <br /> Mark Schaeffer 17.20 6.08 23.28 4.00 93.12 Total Overhd <br /> 0.00 0.00 0.00 0.00% <br /> Exem t Em to ees: 35.40% <br /> 0.00 0.00 0.00 <br /> AFSCME Em . OT: 27.64% 0.00 0.00 ®.00 0.00 <br /> Tem Em Io ees 7.65% 0.00 0.00 0.00 <br /> Ral h Laird 8.00 0.61 8.61 4.00 34.45 <br /> Frank Komisar 8.00 0.61 8.61 4.00 34.45 - <br /> 0.00 0.00 Total Hours 0.00 <br /> Health Frin a no•OT•fuil•time 3.59 16.00 57.44 <br /> Health Frin a no OT- t-20 4.50 0 <br /> Health Frin a no OT- t-30 3.00 0 <br /> LABOR TOTAL: 5 3.15 <br /> EQ~J~~ME~jr' ' ' ' ' ' ; ' ; ; ; ' ' ' indirect Overhead <br /> Hourly Total Equip. General 11 24.64% <br /> Equipment Type Rate X Hours = Charge Road 131 1$.71 <br /> #304036-1 ton icku with utili box 6.85 4.00 27.40 Sewer 533-534-535 15.18% <br /> #304057-1 ton icku with utili box 6.85 4.00 27.40 Fleet 619 117.08% <br /> #532005 -Paint Truck 49.38 4.00 197.52 Transportation 131 17.59% <br /> #s15oo3 -Lot Stri er 2.00 4.00 8.00 Materials 10.00% <br /> 0.00 <br /> 0.00 <br /> 0.00 <br /> 0.00 <br /> EQUIPMENT TOTAL: 260.32 <br /> Actual # of Overhd Material <br /> Material Type Cost X Units + 10% = Charge <br /> <br /> 4x4x12 wood osts $ 12.08 2.00 2.42 26.58 <br /> 10' steel u channel stake 2.00 1.00 0.20 2.20 <br /> 1-30"sto sin 19.90 1.00 1.99 21.89 <br /> 1-36"x12" one wa sin 10.24 1.00 1.02 11.26 <br /> 1-36"x18" handica sin 11.60 1.00 1.16 12.76 <br /> White thermolplastic 0.34 100.00 3.40 37.40 ~Iwa/OIf~::T0~J~1::;:;:':: <br /> White paint (gal) 6.90 5.00 3.45 37.95 Labor <br /> White plastic hot tape 0.69 18.00 1.24 13.66 Charges $03.15 <br /> 0.00 0.00 Equipment <br /> 0.00 0.00 Charges 60.32 <br /> 0.00 0.00 Material <br /> 0.00 0.00 Charges ~ 63.70 <br /> MATERIAL TOTAL: 163.70 TOTAL: 27.17 <br /> Signs for pwe-10-15-03.x1s _ ; 1 _ ~ . ~ ` : y y ~ <br /> <br />