New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
BJE63473
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
BJE63473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 11:17:28 AM
Creation date
8/20/2008 9:43:44 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Journal Entry
PW_Active
No
External_View
No
GJN
004571
GL_Project_Number
995226
Identification_Number
63473
Retention_Destruction_Date
11/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delta Ponds Pedestrian/Bicycle Bridge <br /> Storm System Cost Estimate <br /> May 7, 2008 <br /> BID ITEMS DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST <br /> 1 MOBILIZATION LS 1.00 $7,500.00 $7,500.00 <br /> 2 TPDT LS 1.00 $2,000.00 $2,000.00 <br /> 3 TEMPORARY SIGNS SQ.FT. 80.00 $30.00 $2,400.00 <br /> 4 REMOVAL OF STRUCTURES & OBSTRUCTIONS LS 1.00 $4,000.00 $4,000.00 <br /> 5 EROSION CONTROL LS 1.00 $2,000.00 $2,000.00 <br /> 6 ABANDON CONCRETE MANHOLE EACH 1.00 $300.00 $300.00 <br /> 7 CONNECT TO EXISTING INLET EACH 1.00 $500.00 $500.00 <br /> 8 12 INCH STORM SEWER PIPE, 5 FT DEPTH FEET 47.00 $40.00 $1,880.00 <br /> 9 18 INCH STORM SEWER PIPE, 5 FT DEPTH FEET 100.00 $60.00 $6,000.00 <br /> 10 18 INCH STORM SEWER PIPE, 20 FT DEPTH FEET 184.00 $85.00 $15,640.00 <br /> 11 TV -PIPE FEET 184.00 $1.50 $276.00 <br /> 12 CONCRETE CURB INLET TYPE 4A EACH 2.00 $800.00 $1,600.00 <br /> 13 CONCRETE CURB INLET TYPED EACH 1.00 $800.00 $800.00 <br /> 14 42" CONCRETE MANHOLE EACH 2.00 $1,500.00 $3,000.00 <br /> 15 POLLUTION CONTROL CONCRETE MANHOLE EACH 1.00 $15,000.00 $15,000.00 <br /> 16 LEVEL 2, 1/2 INCH DENSE HMAC TON 45.00 $75.00 $3,375.00 <br /> 17 PERMANENT SEEDING Acre 1.00 $2,500.00 $2,500.00 <br /> BID ITEM TOTAL $68,771.00 <br /> Construction Engineering $7,500.00 <br /> Contingency 10% $6,877.10 <br /> TESTING 2% $1,375.42 <br /> TOTAL $84,523.52 <br /> <br /> f <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.