Run Date: 6/5/2008 Paqe 1 <br /> City of Eugene <br /> Bid Tabulation <br /> Bid #2006-000019 <br /> <br /> Job No. 93-009506 <br /> <br /> 2008 Community Wastewater Extensions <br /> Professional Underground <br /> Engineer's Estimate 2G Construction Services H & J Construction, Inc. Eugene Sand Construction Wildish Construction Co. <br /> Line <br /> N4,. Descri,~tion uan it Uni Unit Price Amount Unit Price Amount Unit Price Amount Unit Price ount <br /> 10 MOBILIZATION 1 LUMPSUM $12,000.00 $12,000.00 $13,339.93 $13,339.43 $26,693.12 $26,843.12 $25,000.00 $25,000.00 $16,165.00 <br /> $16,185.00 $16,000.00 $16,000.00 <br /> 20 TEMP PROTECTN/DIRECTN 1 LUMPSUM $4,000.00 $4,000.00 $2,266.00 $2,266.00 52,SOO,OD $2,500.00 $2,000.00 $2,000.00 $4,000.00 $4,000.00 <br /> $5,000.00 $5,000.00 <br /> 30 EROSION CONTROL 1 LUMPSUM $1,500.00 $1,500.00 $2,525,00 $2,525.00 $750.00 5750.00 $1,500.00 $1,500.00 $2,000.00 $2,000.00 $1,000.00 $1,000.00 <br /> 90 LANDSCAPE 1 LUMPSUM $2,000,00 $2,000.00 53,467.00 $3,467.00 $2,700.00 $2,700.00 $9,000.00 $9,000.00 $4,650.00 $4,650.00 52,000.00 $2,000.00 <br /> 50 TREE PROTECTION ROOT ZONE EXCAVATION 30 HOUR $400.00 $12,000.00 $53.31 $1,599.30 $300.00 $9,000.00 5350.00 $10,500.00 $200.00 $6,000.00 <br /> 5300.00 $9,000.00 <br /> 60 TREE PROTECTION FENCING 540 FOOT $2.50 31,350.00 $4,35 $2,399.00 $2.00 $1,080.00 53.00 $1,620.00 $3.00 $1,620.00 $2.00 $1,080.00 <br /> 70 FLAGGING 30 HOUR $55.00 $1,650.00 546.14 $1,384.20 $95.00 $1,350.00 $46.00 51,380.00 548.00 51,440.00 545.00 $1,350.00 <br /> 60 AC PATCH, ALL DEPTHS 25 TON $195.00 $4,675.00 5229.00 $5,600.00 $115.00 $2,875.00 5200.00 $5,000.00 $200.00 $5,000.00 5200.00 $5,000.00 <br /> 90 CURB & GUTTER, REM/RE PL 30 LINFT $50.00 $1,500.00 $92.54 $2,776.20 $40.00 $1,200.00 $30.00 $900.00 $41.00 $1,230.00 $75.00 $2,250.00 <br /> 100 CONCRETE 4" 720 SQFT 515.00 $10,600.00 $7.68 $5,529.60 55.23 $3,765.60 $7.50 $5,400.00 $7.00 55,040.00 58.00 $5,760.00 <br /> 110 CONCRETE 7" 1450 SQFT $12.00 $17,400.00 $8.24 $11,996.00 $6.22 $9,019.00 $12.00 $17,400.00 $8.50 $12,325.00 $10.00 <br /> 519,500.00 <br /> 120 CONNECTION TO EXISTING STRUCTURES 1 EACH 5400.00 $400.00 5406.00 $406.00 $400.00 $900.00 $600.00 5600.00 $600.00 $600.00 $300.00 <br /> $3DD.OD <br /> 130 CONNECT TO EXISTING STUB 1 EACH 5200.00 $200.00 $269. D0 5269.00 $250.00 $250.00 $200. D0 $200.00 5390.00 $390.00 $75.00 575.00 <br /> 190 CONCRETE SANITARY WASTEWATER MANHOLES 1 EACH $1,900.00 $1,900.00 $2,712. D0 52,712.00 $3,270.00 $3,270.00 $2,000.00 $2,000.00 $2,700.00 $2,700.00 <br /> $3,300.00 53,300.00 <br /> 150 MANHOLES OVER EXISTING SEWERS 2 EACH $2,150.00 59,300.00 $2,224.00 34,498.00 53,836.00 $7,672.00 52,500.00 $5,000.00 $3,600.00 $7,200.00 <br /> $3,200.00 $6,400.00 <br /> 160 CLEANOUT 6 INCH 3 EACH $300.00 5900.00 $339.00 $1,017.00 $125.00 $375.00 5250.00 5750.00 $245.00 $735.00 $170.00 5510.00 <br /> 170 CLEANOUT 8 INCH 1 EACH $350.00 5350.00 $559. D0 $559.00 $300.00 $300.00 $350.00 $350.00 5365.00 $365.00 $350.00 $350.00 <br /> 180 SEWER PIPE PRESSURE 6" 168 LINFT $55.00 59,290.00 $99.13 58,253.89 $39.16 $6,578.88 $93.00 $7,229.00 $83.00 $13,949.00 $76.00 <br /> $12,768.00 <br /> 190 SEWER PIPE PRESSURE 8" 77 LINFT $70.00 $5,390.00 $67.14 $5,169.76 541.90 $3,226.30 $50.00 $3,650.00 $84.00 $6,468.00 $80.00 $6,160.00 <br /> 200 6 INCH PVC PIPE 530 FOOT 550.00 526,500.00 $97.63 $25,243.90 $37.28 $19,756.40 $96.50 $24,695.00 556.00 $29,680.00 <br /> $76.00 $40,280.00 <br /> 210 8 INCH PVC PIPE 205 FOOT $52.00 $10,660.00 $99.20 $10,086.00 539.74 58,146.70 $35.50 $7,277.$0 $94.00 $19,270.00 $80.00 <br /> 516,400.00 <br /> 220 CONNECT TO EXISTING SERVICE LINE 6 EACH $250.00 $1,500.00 5210.00 51,26D.OD $350.00 $2,100.00 5300.00 $1,800.00 $180.00 SS,OBO.OD 5150.00 <br /> $900.00 <br /> 230 DYE TEST AND CONNECTION VERIFICATION 2 EACH $200.00 5400.00 $71.00 $192.00 $275.00 $550.00 $150.00 $300.00 $195.00 $390.00 $150.00 <br /> 5300.00 <br /> 290 LOCATE 5 MAP EXISTING SERVICE 5 EACH $425.00 $2,125.00 $213.00 $1,065.00 S3"15.00 $1,875.00 5400.00 52,000.00 $490.00 52,950.00 $150.00 <br /> $750.00 <br /> 250 POTHOLE 5 EACH $700.00 53,500.00 $911.00 52,055.00 $300.00 $1,500.00 5300.00 $1,$00.00 S35D.OD $1,750.00 5300.00 $1,500.00 <br /> ~T7y: $136,440.00 $115,470.25 $117,065.00 $132,196.50 $146,512.00 $152,933.00 <br /> <br />