New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-87-01
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-87-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:46:36 PM
Creation date
8/18/2008 2:49:32 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Engineering Fees
Document_Date
5/26/1987
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ~S8- 87-v/ ,LPs ~ y <br /> ADMINISTRATIVE ORDER <br /> OF THE <br /> PUBLIC WORKS DIRECTOR <br /> City of Eugene, Oregon <br /> 'In order to: <br /> A. Charge to local improvement districts, engineering fees that closely <br /> reflect average costs, and, <br /> B. Provide a fair and equitable charge for services to property owners, <br /> The Public Works Director finds that: <br /> 1. The amount currently charged for engineering services to local <br /> improvement districts is not adequate to recover the actual costs <br /> incurred. <br /> 2. A study and analysis of these fees is underway and needs to be <br /> completed to determine a reasonable and equitable charge rate. The <br /> estimated completion date for the analysis is September 30, 1987. <br /> 3. An interim increase in the current charge rate needs to be implemented <br /> pending completion of the study and analysis in order that the City may <br /> recover, on current and new projects, an amount that more closely reflects <br /> actual costs. <br /> 4. A preliminary analysis indicates that engineering costs over the past <br /> five years have averaged 19.15% of project construction costs. <br /> Based on the above findings, the Public Works Director orders that: <br /> Property owners in local improvement districts be assessed a charge for <br /> engineering services at a rate of 19% of actual project construction <br /> costs. This rate will apply to all projects assessed after May 1, 1987 <br /> until changed by administrative order. <br /> This 19% rate is considered an interim rate adjustment pending final <br /> recommendations from the rate study and analysis. Should the 19% rate <br /> be determined by the analysis to meet the objectives stated in A and 6 <br /> above, then that rate will remain in effect until further action by the <br /> Public Works Director. Should the 19% rate require further adjustment, <br /> either increased or decreased, then anew administrative order will be <br /> issued by the Public Works Director which would apply only to those <br /> projects assessed after the date of the new administrative order. <br /> In accordance with authority granted by Section 7.007 of the Eugene Code, 1971, <br /> this administrative order is issued and dated 19~Z. <br /> engfees ristine Andersen, Public Works Director <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.