New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-95-02-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-95-02-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:51:49 PM
Creation date
8/15/2008 3:37:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Stormwater SDC Methodology
Document_Date
4/30/1995
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> i <br /> Custo ers who appeal the building foot print size for their property must complete an <br /> applic Lion which includes a sketch of their house and garage with accurate dimensions of <br /> <br /> ~ buildin s from which the total building foot print can be calculated. (See Attachment 1) The <br /> measu ements and resultant building foot print may require verification by a site inspection <br /> by Ci staff. For residential customers, no reductions will occur if the change is less than that <br /> neces to cause the customer's building foot print to fall within a different customer <br /> The f llowing is a list of standards that must be met by a site plan submitted for review of <br /> impe 'ous area: <br /> 1. Th plan must be prepared. by an architect, engineer, or comparable professional. <br /> 2. Th lan must be a drawing to_a measurable scale with dimensions included d~~ <br /> t a;~e~ o ink <br /> ervi . e. The quality shall be <br /> co sistent with that expected for building permit submittals. <br /> 3. Fo general customers, given that an ESU is based on 1000 square feet of impervious area <br /> in ements, no reductions will occur if the change is less than that necessary to cause the <br /> cu tomer's ESUs to fail within a different range. <br /> 4. Th plan will show the locations of private and public storm sewer facilities currently in <br /> us ,within and adjacent to the site. <br /> 5. A ite visit may be required to verify the information submitted. <br /> The Ci Engineer may approve, approve with conditions or reject the plan's conclusions on <br /> the am unt of impervious surface or building foot print. In the event that the conclusions are <br /> approv ;the customer will receive a credit for any excessive impervious area-based charges <br /> paid d rin;~ all or part of the 12 months preceding the application. <br /> The. n tuber of ESUs will continue until the property is further developed or until the City <br /> engin r deternunes the property no longer qualifies for the adjustment given. If the property <br /> is dev oped further, the customer may submit an application for another evaluation of the <br /> numbe of ESUs if the customer is not satisfied with the City's calculation. <br /> 6.3 Formal Appeals Progess <br /> If no reement is reached with an informal application process, then the customer may <br /> institut the formal appeals process as provided in 6.416 of the Eugene City Code. <br /> <br /> ~ Stormwater S rvice Charge: Methodology Paper -Page 15 <br /> <br /> ~ Draft Revision -April 10, 1995 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.