New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-95-08-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-95-08-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:52:33 PM
Creation date
8/15/2008 3:37:12 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
7/26/1995
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT #1 OF EXHIBIT A <br /> AMENDMENTS <br /> TO <br /> CITY OF EUGENE, ENGINEERING DIVISION, PUBUC WORKS DEPARTMENT <br /> SYSTEMS DEVELOPMENT CHARGE METHODOLOGIES <br /> EFFECTIVE, FEBRUARY, 1993 <br /> COMPLETE: COPIES OF THE FULL METHODOLOGY ARF AVAILABLE FUR INSPECTIUN AT THE <br /> . FOLL0IM NG LOCATIONS: <br /> Public Works Dep~artmerrt ; The-Eugene Public Library <br /> 858 Pearl St., Lobby 100 West.13th' Ave <br /> The Perrrit and Information Center City Hall <br /> NEW LOCATION: Atrium Building 777 .Pearl. St. <br /> 99 West 10th Ave <br /> BASED ON THE ENGINEERING NEWS-RECORD PUBLICATION, THE FOLL0IMNG CHANGES 1MLL BE MADE, EFFECTIVE AUGUST 01, 1995. THE <br /> PROPOSED CHANGES REPRESENT THE CUMULATIVE INCREASE IN CONSTRUCTION COSTS OF 2.8 % + 3.7% in 1993, 5.8% in 1994, and 2.65% <br /> PROPOSED I N 1995: <br /> PREVIOUS -Effective date 7/1/92 -3/1/93 ~ <br /> PAGE LOCATION Subse vent Administrative Orders addressed the annual inflation than es PROPOSED -Effective August 1 1995 <br /> 1 Section 1.0 4) 'The figures used in.... described in paragraph 2.2 below." Para ra h <br /> g p replaced by 'The figures used in the appendices <br /> are those which appeared in the May 1991 adopted <br /> Methodologies. They do not agree with the current fee <br /> schedule. The 1991 figures have been increased 2.8% in <br /> 1992, 3.7% in 1993, 5.8% in 1994, and 2.65% in 1995." <br /> <br /> 6 Table 1 Current Table to be removed Table replaced, (see attachment 2) <br /> 10 Section 3.0 3) Transportation System Charge per tri $453.75 <br /> p = Charge replaced, per trip = $511.02 <br /> PAGt ~ OF 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.