New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-96-06-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-96-06-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:54:06 PM
Creation date
8/15/2008 2:48:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
MWMC SDC Methodology
Document_Date
5/8/1996
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
° ~ Attachment #4 of Exhibit A <br /> <br /> « Administrative Order No. 58-96-06 <br /> Page 5 of 5 <br /> 2.3 Large Volume Users with wastewater discharge greater than 100,000 <br /> gallons per day <br /> or existing development with measured or proposed total flow greater than <br /> 1 0,000 gallons of water discharged per day, the regional wastewater charge is <br /> e ual to the total amount of water being discharged per day (Total Flow), divided <br /> b the presumed continuous EDU flow estimate, multiplied by the rate for one <br /> DU. The presumed continuous EDU flow estimate (average gallons per day) <br /> r presents the assumed daily flow of a typical EDU, if continuous consumption <br /> ere to occur over a 24 hour period. The presumed continuous flow measurement <br /> i estimated at 600 gallons per day. The SDC charge will be based on the greater <br /> o calculations using either the City methodologies or the can-ent MWMC <br /> qualization Fee charge as directed by the MWMC Commission-approved <br /> ethodology applicable to proposed new development. <br /> 2.3 drninistrative Charge <br /> A furthe adjustment to the base equalization charge is the addition of administrative <br /> costs. WMC will incur staff costs for the updating and processing of the charge. These <br /> costs w uld be applied on a per connection basis. The administrative cost per permit is <br /> calculat d, based on estimated administrative costs and future connections. Calculation <br /> of the R gional Facility Equalization Charge is illustrated in Figure 6. <br /> my 01, 199 Methodologies: City of Eugene Page D-6.2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.