i <br /> Findinn: All construction activities that disturb land are affected by the program <br /> including the placement of building and landscape materials in the public right-of--way. <br /> Therefore, there is no need to adjust the rule. <br /> Comment 16: Why were the necessary materials needed for review, such as the <br /> manual, template, sensitive areas map not available for review? <br /> jl <br /> Finding: Most of these materials have been available for review since December <br /> 1995 and their availability has been announced publicly. <br /> Comment 17: Where does the program apply? <br /> Finding: Within the city limits of Eugene. <br /> Comment 18: Who is responsible for release of hazardous substances at a <br /> construction site. <br /> i <br /> FiFi <br /> dingy: For activities requiring an erosion permit, the permittee (property owner <br /> or easement holer) is responsible for meeting the requirements of the program and permit. <br /> For non-permitted conditions, property owner or easement holder. <br /> i <br /> Comment 19: The City Council should review the Administrative Rule prior to <br /> ' finalization. <br /> i, <br /> 'din :City Councilors were provided copies of the proposed rule and fee schedule <br /> I ! for their review. <br /> Comment 20: Program will affect cost of homes. <br /> ~I <br /> 1 in in :This issue was raised at the time the ordinance was considered. With most <br /> of the single family dwellings requiring a permit, costs to this group were considered <br /> minimized while benefits to water quality were raised. The ordinance was approved. This <br /> ~ issue is out of the scope of the Administrative Rule. Therefore, there is no need for rule <br /> <br /> ~ I adjustments at this time. <br /> Comment 21: Blanket permits should be allowed for new subdivisions. <br /> Fording: The umbrella permit, R6.645-F3.2, provides this application. Therefore, <br /> j there is no need to adjust the rule at this time. <br /> Comment 22: Stop work orders should only apply to the area of violation. <br /> Erosion Prevention Administrative Rule R-6.645 - 5 <br /> <br />