<br /> j <br /> TABLE B-1 <br /> Regi nal Wastewater Systems Development Charge Analysis <br /> T~ptal Assets $183,186,637 <br /> Total Liabilitie ($127,231,040 ) <br /> Local Equity ( et assets) $55,955,598 <br /> System Capa ty (potential EDUs) 169,145 <br /> Base Charge er EDU $331.00 <br /> Administration charge per permit [ $55,955,598 / 169,145 = $330.80 rounded) $10.00 <br /> 2. egional Wastewater SDC Rates For All New Development <br /> egional Wastewater SDCs For New Single Family Dwellings and Duplex <br /> Development <br /> For atl new single family dwellings, the regional wastewater SDC collected is equal <br /> to the rate for one EDU. For all new duplex development, the regional wastewater <br /> SDC is equal to two times the EDU. <br /> Regional Wastewater SDCs For All Other New Development with Annual <br /> Average Daily Fiow less than 100,000 Gallons <br /> For all other new development with proposed annual average daily flow less than <br /> 100,000 gallons of water discharged, the regional wastewater SDC is collected <br /> based on the rate per plumbing fixture unit multiplied by the number of plumbing <br /> fixture units in the proposed development. <br /> Regional Wastewater SDCs For All Other New Development with Annual <br /> Average Daily Flow Equal to or Greater than 100,000 Gallons <br /> For all other new development with proposed annual average daily flow equal to or <br /> greater than 100,000 gallons of water discharged, the regional wastewater SDC <br /> collected is equal to the annual average daily amount of water discharged, divided <br /> by the EDU standard 200 gallons per day, multiplied by the rate for one EDU. The <br /> regional wastewater SDC charge will be based on the greater of calculations using <br /> either the City methodologies or the current MWMC Equalization Fee charge. <br /> Exhibit B to administrative Order No. 58-97-02-F-1 <br /> i <br /> <br />