<br /> ~ <br /> METHODOLOGY: <br /> City of Eugene Systems Development Charges <br /> Appendix G <br /> <br /> ~ May 1, 1997 <br /> i <br /> 1.0 Formu a and Calculation Details <br /> 1.1 G neral Rate Setting, Cost of Service Formula: <br /> S G eli ible costs.. <br /> 9 <br /> SDC per un~ ofservice°, <br /> Emp ct Measurement <br /> 1.2 T nsportation System Cost of Service [add cost per trip for: street system ($475.374) <br /> <br /> i • ~ + treet system lighting ($122.072) + bicycle path system ($60.56) + bicycle path system <br /> <br /> ~ li hting ($7.49) =total cost per trip ($665.49)]: <br /> 1. .1 Street System Cost of Service <br /> Miles .per friP <br /> X Cost per lane mile= - Cost per drip <br /> apacity per: lane mile - . <br /> 0.665 . ` <br /> _ <br /> X $418,621 = $415.37 (per #rip} ~ <br /> 615 - (5475:374+.$122.072=5597.45.},.:-. <br /> ~I <br /> ~ 1. .2 Street Light System Cost of Service <br /> Miles per trip <br /> X Cost per light. - = cost per trip <br /> apac'rty per lane mile <br /> Q.7665 _ _ - <br /> F X $4,300 - $122.07 (per tripe <br /> Zl (5475.374 + 5122.072 =5597.45) # <br /> _ _ <br /> . <br /> <br /> 'I <br /> May 1, 199 City of Eugene SDC Methodology Page G-1 <br /> d <br /> <br />