New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-02-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-02-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:09:17 PM
Creation date
8/15/2008 11:04:26 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
4/30/1997
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> ? I'i.. <br /> I <br /> ' TABLE 6 <br /> <br /> ~ S ormwater Drainage System Development Charge Analysis <br /> ~ 1. Analysi of Stormwater Drainage System Value <br /> Total R placement Cost -Pipe $72,259,689 <br /> Total R placement Cost -Open Channel Systems $20,303,830 <br /> Total R placement Cost -Other Stormwater Components $23,647,185 <br /> Total R placement Cost of Starmwater System $116,210,704 <br /> 2. Analy is of Assessable Cost <br /> ~ Assess ble portion of piped system $47,227,719 <br /> Assess ble portion of open channels $0 <br /> Assess ble portion of other system components $18,346,066 <br /> Total ssessable Cost = $65,573,785 <br /> . 3. Storm ater System Calculation Details <br /> Single- amity Dwelling (SFD) average lot size in city limits 9,200 sq. ft. <br /> Reside tial Runoff Coefficient 35 percent <br /> Averag Manufactured Home Park space size (double wide) 1,684 sq. ft. <br /> Total D veloped Acres inside City Limits 12,653 Acres <br /> Total N tuber of Acres of Impervious Surface 7,868 Acres <br /> 4. Calcul tion of SDC <br /> 'Hon-A sessable Cost - _ - $50,636,919 <br /> Cost p r Acre [ $50,636,919 / 7,868 ] $6,435.81 <br /> Cost p r Square Foot [ $6,435.81 / 43,560 ] $0.148 <br /> Cost p r SFD flat rate [ s,2oo x 0.35 x $0.148 = $476.00 rounded ] $475.74 <br /> Cost p r Duplex flat rate [rate for SFD x 2 = $951.00 rounded J $951.48 <br /> Cost p r SFD = or > 3,000 building footprint [ $475.74 x 1.5 ] $713.61 <br /> Cost p r Manufactured Home Park Space [ ~ ,684 x $0.148 ] $249.23 <br /> i <br /> ' May 1, 199 City of Eugene SDC Methodology Page E-3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.