<br /> ~ I~{ <br /> i <br /> II <br /> Table of Contents <br /> Methodology 1 <br /> ~ A endix A - S stems Develo ment Char es Ordinance A-1 <br /> PP Y P 9 <br /> Appendix B -Definition of Terms B-1 <br /> Appendix C -Transportation System Charge Detail C-1 <br /> Appendix D -Wastewater System Charge Detail D-1 <br /> Appendix E -Stormwater System Charge Detail E-1 <br /> ! Appendix F -Parks System Charge Detail F-1 <br /> ! Appendix G -SDC Fee Schedule and Formula Detail G-1 <br /> i <br /> I <br /> i <br /> List of Attachments. <br /> Attachment 1 -Trip Rates C-11 <br /> Attachment 2 -River Road/Santa Clara/Highway 99 Area <br /> -City Wastewater SDC Rate D-2 <br /> i <br /> List of Tables <br /> Table 1 -Summary of Systems Development Charges 3 <br /> ' Table 2 -Potential Credits for Systems Development Charges 15 <br /> Table 3 -Transportation Systems Development Charge Analysis C-5 <br /> Table 4 -Local Wastewater Systems Development Charge Analysis D-3 <br /> Table 5 -Regional Wastewater Systems Development Charge Analysis D-8 <br /> Table 6 -Stormwater System Development Charge Analysis E-3 <br /> Table 7 -Parks Systems Development Charge Analysis F-2 <br /> List of Figures <br /> Figure 1 -Rate Setting Methodology 5 <br /> Figure 2 -Transportation System, Streets C-4 <br /> Figure 3 -Transportation System, Off-Street Bike Paths C-8 <br /> Figure 4 -Local Wastewater System D-4 <br /> Figure 5 - MWMC Wastewater System D-7 <br /> Figure 6 -Stormwater System E-2 <br /> Figure 7 -Parks System F-3 <br /> i <br /> I <br /> I <br /> May 1, 1997 City of Eugene SDC Methodology Table of Contents <br /> <br />