New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-02-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-02-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:09:17 PM
Creation date
8/15/2008 11:04:26 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
4/30/1997
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> M <br /> ~ ~ <br /> 43.4.4 The traffic study shall be designed in accordance with <br /> the methodology descn'bed in the Institute of <br /> Transportation Engineers Trip Generation Manual, <br /> current edition. <br /> 43.4.5 The request to use the alternate calculation shall include <br /> a detailed description and drawing of .the proposed <br /> development site, a description and drawing of each <br /> sampling site, a description of why these sites are <br /> representative of the impact likely to be generated by <br /> the proposed development and such other information <br /> as may be required by the City's Traffic Engineer. <br /> c leted re ort of the stud shall be in a form <br /> 43.4.6 The omp p y <br /> approved by the City's Traffic Engineer and upon its <br /> completion shall be submitted to the City's Traffic <br /> Engineer for approval. <br /> 43.5 The City's Traffic Engineer may approve, approve with conditions or reject <br /> the trip generation rate calculated in a report prepared under paragraph 4.3 <br /> hereof. Upon approval the trip rate for the proposed development shall be <br /> used to calculate the transportation SDC. In the event that the Alternate <br /> Calculation results in a transportation SDC less than the Standard Calculation, <br /> upon approval of the Alternate Calculation by the City Traffic Engineer, the <br /> City shall refund the excess transportation SDC collected to the applicant or <br /> reduce the amount the applicant agreed to pay. If the approved Alternate <br /> Calculation results in a transportation SDC greater than the Standard <br /> Calculation, the applicant shall pay the underage to the City or modify the <br /> agreement to pay to include the underage. In the event the applicant fails to <br /> promptly pay the underage to the City or to promptly modify the agreement <br /> to pay, the City may suspend the permit for the development until payment <br /> is made or the agreement to pay is modified to include the underage. <br /> i <br /> i <br /> February 24, 1993 Methodologies: City of Eugene 5DCs Page C-11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.