TABLE 2 <br /> Potential Impact Reduction and Credits for Systems Development Charges <br /> **NOTE: List of examples; eligibility depends on compliance with criteria in SDC Policies and <br /> Procedures document. <br /> 1. Transportation System <br /> REDLIGTIONS• <br /> Successful bus pass program for employees <br /> CREDITS: <br /> Residential: <br /> Street widths > 36 Feet <br /> CommerciaUlndustrial: <br /> Street widths > 44 feet <br /> Off-site, non-contiguous intersections for arterial and collector streets <br /> Transit shelter and pullout <br /> Street lights on arterial and collector streets <br /> Off-site right of way and easement acquisition <br /> Traffic signals <br /> Off-street bicycle paths identified in TransPlan or other City plans <br /> Offsite public improvements where equivalent assessments can be collected <br /> 2. Wastewater System <br /> CREDITS: <br /> Public Wastewater collection lines > 8-inch diameter <br /> Public pump stations and pressure lines that serve more than the development <br /> Offsite public sewer improvements, where equivalent assessments can be collected <br /> 3. Stormwater System <br /> REDLIGTIONS• <br /> Retention system (e.g. Drywells, infiltration trench) <br /> CREDITS: <br /> Stormwater collection lines > 24-inch and 60-inch in diameter <br /> Major drainage channels: construction and off-site easement <br /> Offsite public improvements where equivalent assessments can be collected or that benefit existing <br /> developments <br /> 4. Parks System <br /> CREDITS: <br /> Land dedication (for sites accepted by City, consistent with adopted City Plans) <br /> Onsite park facility dedication (for improvements accepted by City, consistent with adopted City Plans) <br /> <br /> May 1, 1997 City of Eugene SDC Methodology Page 15 <br /> <br />